Thomas Long
I-Have-No-Idea-What-I'm-Doing from Nashville!
16 June 2018 | 20 replies
That, plus we're refinishing our second floor, which currently doesn't count as livable space although it was intended to be, that will add another bedroom and bathroom on to the house as an extra 500 ft or so of sqfootage.
Colton Duhr
New to Wichita area looking for good contractors
15 February 2017 | 5 replies
Welcome @Colton DuhrGood contractors are hard to come by - depending on what you need done you can go the J Scott suggested route and hit up Lowes or HD or Menards early in the morning and see which guys are hurrying around for their prospective trades, painters/refinishers will be at Sherwin Williams or Porter Paints around here - I'm sure the guys at the counter can tell you which contractors are ordering the most paint and the busiest and give you a referral.
Erin Margaret
Advice on contractor woes
23 October 2016 | 6 replies
We have been going since may and are down to just refinishing the floors and a few final touches.
Account Closed
Rehab for a LTR buy and hold
1 January 2019 | 3 replies
Update cabinets (refinish/color)2.
Andrew L.
House Hacking in Utah
10 May 2017 | 16 replies
I have also added some sweat equity in the form of refinished original hardwood floors and new paint throughout.
Jeffrey Gignac
2nd Buy and Hold - Residential Property
4 January 2017 | 9 replies
Paint, wood floor refinishing, and a small section of water damaged ceiling are the repairs noted from my first walk through with my agent.
Andrew Yanowitz
1st Flip - under contract, inspection ends Friday - Help!!!
29 May 2018 | 2 replies
See the Zillow link for the property below; interior is only 2,000 sq. ft not 2,556 (2,556 includes the garage)https://www.zillow.com/homedetails/600-N-13th-Ave-...Work for this house would include turning it into a 3/3 while leaving the existing 2 car garage, 3 brand new bathrooms, remove the wall separating the kitchen from family room, refinish and/or replace kitchen cabinets (countertops will be reused), replace all exterior doors and windows with new impact glass, new HVAC system with duct work, minor electrical (high hats, new fixtures, inspection repairs), paint, new casing/baseboard, and maybe new interior doors.I have also listed below my report from bigger pocket calculator on my return for the flip.
John Hernandez
My first flip is almost completed
21 March 2008 | 2 replies
I have to refinish the hardwood floors then we will be ready to sell.
Wade Bartels
My First BRRRR - 4130 Adams Street
24 September 2019 | 0 replies
I'm painting the interior, exterior, new roof, lots of yard cleanup, refinishing the wood floors, building out a bedroom and bathroom downstairs, adding egress windows.
George Firn
General Contractor recommendation in Ypsilanti
26 December 2016 | 3 replies
I haven't actually been inside yet but it looks like it will need a kitchen remodel, maybe take out some walls, additional drywall repair, full interior paint job, hardwood floor refinish.