
16 April 2021 | 7 replies
He also put in infrastructure including paved entrances and all the water/plumbing for the land.
10 October 2022 | 22 replies
I would suggest looking for a home you can convert the basement to a 1 bedroom apartment with kitchen and separate entrance if you are looking to maintain privacy.

25 July 2022 | 1 reply
I’ll be comparing graduation rates, percentage of graduates who meet UC/CSU entrance requirements, total students, students per teacher, college-going rates, test scores, and overall website grades.

22 January 2022 | 11 replies
I'm going to assume you don't want to live in the same house as the renters, meaning no separate entrance?

22 November 2020 | 13 replies
However, we have much more control over our entrance and exit finances than in a 401k plan.

20 December 2022 | 6 replies
Are fire rated doors required for the two exits, and apartment entrances?
10 July 2018 | 5 replies
One of the repairs required by code is that the entrance doors for each of the units need to be at least 60-minute fire rated, but I am having trouble finding a store that supplies this for an interior wood door.

5 November 2021 | 10 replies
He kind of overbuilt for the neighborhood and his contractor went over budget, so he moved in himself and did a STR in the Master bedroom (which has it's own entrance).

4 December 2022 | 13 replies
They can squeeze through small holes for sure but there shouldn't be any small hole entrances into your home.

23 January 2023 | 7 replies
Here is the basic timeline:- Purchased property in late 2019 for $490,000- Property was a 2 story 4 bed/2.5 bath house with a full unfinished walkout basement- Premium for the property compared to one without the walkout was somewhere around $30-40,000- Basement was around 1200sqft unfinished space and the apartment was best setup to be around 800sqft- Started initial framing in early 2020, but COVID put a stop to some plans due to cash reserves becoming more important- Project was on hold until late 2021 when framing resumed (all framing was done by me)- Jan 2022 had a tankless water heater installed (had 20 year old tank already and don't want to run out of hot water with tenants) $3500- Jan 2022 had main electrical panel upgraded to 200A setup and also had 100A sub panel installed in basement and charger for car in garage $6000- Feb 2022 finished 95% of framing and GC began plumbing work- Feb 2022 HVAC work began (We installed a fully separate Mini Split Heat Pump for the unit) $5,400 for all fans and mini split install- March 2022 Electrical Rough In was completed- March 2022 Rear Door (Entrance) was swapped from a small slider to a full 36" exterior door- March 2022 Passed rough inspections and given the go ahead for drywall- Late March 2022 Drywall install completed- Walls are standard 1/2" single sheet- Ceilings were done in the following order for sound insulation (Fiberglass batting, resilient channel, 5/8" drywall, Green Glue, 5/8" drywall) $7500- April 2022 Primed all walls and ceiling- April 2022 Carpet and Vinyl flooring installed- April 2022 Trim installed- April 2022 Kitchen cabinets installed- Mid April 2022 Interior doors arrived and were installed- Mid April 2022 Shower pan was built out- Mid April 2022 Butcherblock counters cut and fitted with sink and oiled- Mid April 2022 Puck lighting installed- Late April 2022 Appliances arrived- Late April 2022 Painting continues (biggest regret here was not hiring a painter.