Becca F.
Overleveraging, net worth, cash flow and headache factor
9 May 2024 | 159 replies
I got to where I enjoyed the game.Anyway, move at your own pace, take your time, smell the flowers, and enjoy the ride.
Alyssa Coffey
Wholesalers: Water Shut Off List
1 May 2024 | 26 replies
There is a way to do it but once you find out let me know.
Natalie Medved
Furnishing STR Do's and Don'ts
30 April 2024 | 29 replies
In one market, used items were hard to find- just not a lot outlets outlets for them.
Lina Emory
DSCR, Line of Credit or something I haven't thought of?
30 April 2024 | 7 replies
We can do either a 30 year fixed DSCR product or, an even better option would be a 24 month bridge product at 75% LTV cash out! Let's
Summer Dechanukul
I did a mistake by 100% trust the realtor and end up with a nightmare
30 April 2024 | 101 replies
I have done changed the HVAC for both unit, brand new and for HVAC the inspection was already passed. and I changed all windows for both unit. also I changed the new electric panels and changed all outlets for both unit but the inspection said I needs to run all electric the whole house which means I have to pay more for run the electric and replace all drywalls, that means I have to put lots more money into it.the question is should I go further or should I cut loss?
Navid A.
Plumbing/sewer question on a fourplex regarding ejector pump/pit.
30 April 2024 | 9 replies
This is not an exact picture, but as you see in the picture the outlet (pressure side) of the system is white PVC (plastic) pipe and not black ABS (plastic) pipe.It appears that the existing tank you have is plastic and not too large.
Kay Mistry
Reaching Potential Homebuyers Out of State
28 April 2024 | 2 replies
Have a property for sale in Delaware (15 min from the beaches and outlets, close to two country clubs,etc).
Marco Werner
Add value through ADU conversion
28 April 2024 | 5 replies
Instead I have decided to add some extra electrical outlets and put in lights and rent it as a workshop.
Jim Windgassen
Electric Vehicle Charging - Draft Lease Statement
26 April 2024 | 11 replies
I am also an Electrical Engineer.Who is responsible for installing the outlets for level 2 chargers?