![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/216815/small_1621433921-avatar-ciscobuyer.jpg?twic=v1/output=image&v=2)
22 January 2025 | 1 reply
., the 2006 or 2009 IECC — International Energy Conservation Code).Cost Considerations for a 90-unit or 112-unit Project:The actual cost of qualifying for the 45L tax credit depends on various factors, including:Energy Efficiency Compliance: The primary cost will come from ensuring that each unit meets the required energy efficiency standards, which typically involve energy modeling, certification from third-party energy raters, and potentially upgrading insulation, HVAC systems, windows, and other components of the building to meet the necessary performance levels.Energy Modeling: Typically, you'll need to pay for an energy consultant or engineer to model the building's energy performance and ensure it qualifies for the credit.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1308749/small_1703023150-avatar-rogerf31.jpg?twic=v1/output=image&v=2)
21 January 2025 | 10 replies
Are there any guidelines or best practices (ie: rewiring such a property would be more valuable than updating insulation).Is it something you need to ask the insurance company about to get, or is all this determined in the initial interview with the potential insurer?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3172548/small_1737472177-avatar-rouo.jpg?twic=v1/output=image&v=2)
24 January 2025 | 7 replies
ACM (Asbestos Containing Material) abatement is a tough one because often you won't know (outside pipe insulation & 8x8 tiles which I can spot and point out with no testing).
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1063322/small_1621508292-avatar-deank24.jpg?twic=v1/output=image&v=2)
31 December 2024 | 4 replies
I think you are looking at the wrong places, insulating the floor wouldn't change much.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3160192/small_1734932951-avatar-sophanara.jpg?twic=v1/output=image&v=2)
31 January 2025 | 10 replies
You have to consider insulation and heating/cooling too.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2531916/small_1736472567-avatar-beauw26.jpg?twic=v1/output=image&v=2)
12 February 2025 | 17 replies
The interior is a total gut: new insulation, sheetrock, plumbing, electric, kitchen, bathroom, doors, windows, and landscaping.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3119902/small_1726512403-avatar-recostseg.jpg?twic=v1/output=image&v=2)
22 January 2025 | 8 replies
Low Risk: TDAs are insulated from market volatility, offering peace of mind.4.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2797963/small_1692025584-avatar-desireer30.jpg?twic=v1/output=image&v=2)
24 January 2025 | 0 replies
Typical renovations include:Cosmetic Updates: Painting, flooring, kitchen and bathroom upgrades, and landscaping.Structural Repairs: Fixing any underlying issues such as foundation repairs, plumbing, or electrical updates.Efficiency Improvements: Adding energy-efficient windows, new HVAC systems, and better insulation to increase the property's overall value.The goal of the rehab phase is to increase the property’s market value while making it an attractive place for tenants.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2301154/small_1668834732-avatar-loganr91.jpg?twic=v1/output=image&v=2)
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2719494/small_1694587544-avatar-brandonm945.jpg?twic=v1/output=image&v=2)
9 January 2025 | 3 replies
hi all i am a new landlord and got my first rental property. tenants moved in in September and October. the first month was fine but when December hit it got extremely cold and the heating is electric. due to poor insulation in the home that we did not know about the heat has to be turned very high up to keep the home warm, however since everything is electric it is causing the electric bill to be $800. the utilities are the tenants responsibility. however because of this one of the tenants has been extremely non compliant with paying rent.