
7 August 2018 | 2 replies
I then repaired the sheet rock, texture and painting of the ceiling myself.

14 August 2018 | 14 replies
Heck, his hands are often painted red.

15 August 2018 | 6 replies
I've seen homes with T1-11 sheets for porch ceilings, stained or painted white.

13 August 2018 | 8 replies
Mostly paint carpet and some common space clean up.

24 August 2018 | 8 replies
Removing carpets, sweeping floors, painting walls, whatever.

14 August 2018 | 5 replies
As noted you will want a full inspection done on the following: roof, sewer lines (scoped by a licensed specialist), lead paint check (specialist), test for asbestos if you have popcorn ceilings.

5 June 2020 | 36 replies
Gated community, 3/3/2car 1512sf built 2006 Monthly costs Hoa 66, insurance 57, management 89, taxes 58 rents for $1125 $212k value = $170k loan @ your 4.612% = $873 total $1143 (minus $18/mo)In the last year I had to paint the trim ($500) and fix clothes washer ($237)#2 preferred single story model, not Gated community, 3/2/3 car 1456sf built 1993Monthly costs Hoa 0, insurance 44, management 90, taxes 64 rents for $1125 $250k value = $200k loan @ your 4.612% = $1027 total (minus $100/mo)In the last 2 year I have had zero repairs #3 non-Gated community, 3/3/2car 2200sf built 2007Monthly costs Hoa 57, insurance 46, management 98, taxes 74 rents for $1375 $264k value = $210k loan @ your 4.612% = $1078 total $1353 (plus $22/mo)In the last year I had to replace the stove ($590) and fix a sewer line blockage ($125)In north Las Vegas sewer is included in garbage,recycling/water bill from the city. in Las Vegas I bill the tenant for sewer per the lease (about $250/year)

19 August 2018 | 3 replies
This include cleaning, painting and doing any repairs to get the house ready to sell and I can hold selling rights for 90 days.

16 August 2018 | 8 replies
@John LeavelleThanks John, I literally just put a couple numbers in that were low because I've completely made the property new from the roof all the way to the exterior siding, paint, unit 1 & 2 now have new carpet, cabinets, granite counter tops and tile flooring.