
2 August 2021 | 7 replies
Full ac replacement $4200, full house repaint $2800, 2x fan motor and compressor motor rebuilds $2,000.

27 September 2021 | 14 replies
They insisted on being able to install a hot tub and getting a dish mounted on the roof despite the lease not allowing them and me telling them no several times, etc.
20 August 2021 | 31 replies
The hotness on top of the AC unit is where the motor is located on the fan.

10 September 2020 | 13 replies
Areas I think you should strongly consider based on your notes: oak harbor, Anacortes, Mount Vernon, Burlington, sedro wooley, Everett, Arlington, ferndaleThese areas are growing, are still affordable, and are more working class neighborhoods.

30 April 2019 | 6 replies
What’s the thought about allowing them to have a motorized scooter in the home when most of it is carpet.

12 January 2020 | 4 replies
Then again we did have a blower motor on a NEW Lenox furnace (we had in a rehab) fail mid winter & had a 2 day wait for the part to come from TX.

25 May 2020 | 5 replies
You can take an existing 120V plug if you have an extra in a room and mount these on the wall over the plug wired into where the plug used to be.

25 January 2021 | 15 replies
If it were me I would go with a 9,000 Btu wall mounted Mitsubushi heating and cooling unit or something similar. https://www.mitsubishicomfort....

26 April 2021 | 1 reply
I’m currently a south nj resident, Mount Laurel but from Vineland, however I’m ready to leave state soon when this aide position is over.

3 May 2021 | 3 replies
Once the walls were down we soon discovered a couple of near misses from past contractors to the main water supply line running up stairs as well as a perfect shot from a finishing nail into the PVC drain.Needless to say cabinets would have to wait and the walls came down and went back up.Walls were up and although not ready to mount cabinets till a couple more rounds of mud can be applied we pushed ahead with laying the kitchen and bathroom tile.Up in Apartment 11 grout is in and cleaned up and the toilet has found its new home, this one is a marked improvement form the old one we tore out.