![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1389581/small_1626214937-avatar-jessicat95.jpg?twic=v1/output=image&v=2)
21 December 2019 | 12 replies
@Joe Splitrock also this is exterior door access to the common stairway not the unit itself.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/550148/small_1621492349-avatar-moshebh.jpg?twic=v1/output=image&v=2)
20 October 2017 | 3 replies
My main concern here is with the existing second egress upstairs (porch leading to stairway), which is structurally unsound and must be taken down.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/711977/small_1641649870-avatar-matts209.jpg?twic=v1/output=image&v=2)
22 December 2017 | 7 replies
It states in part that:The owner shall maintain all means of egress at all times in a safe, operable condition and shall keep all exterior stairways, fire escapes, egress balconies and bridges free of snow and ice, provided, however, in those instances where a dwelling has an independent means of egress, not shared with other occupants, and a written letting agreement so states, the occupant is responsible for maintaining free of snow and ice, the means of egress under his or her exclusive use and control.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/491867/small_1621479085-avatar-davidbellmont.jpg?twic=v1/output=image&v=2)
27 December 2017 | 5 replies
@Brie Schmidt I found the following under the Massachusetts general laws defining condos:''Common areas and facilities'' shall, except as otherwise provided or stipulated in the master deed, mean and include:—(1) The foundations, columns, girders, beams, supports, party walls, common walls, main walls, roofs, halls, corridors, lobbies, public stairs and stairways, fire escapes and entrances and exits of the building;(2) Installations of central services such as power, light, gas, hot and cold water, heating, refrigeration, air conditioning and incinerating;(3) The elevators, tanks, pumps, motors, fans, compressors, ducts, and in general all apparatus and installations existing for common use;
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/748506/small_1621496613-avatar-brendanl13.jpg?twic=v1/output=image&v=2)
4 May 2017 | 4 replies
FIRST UNIT ADDRESSScope of WorkINTERIORCut steam pipe above electrical box in basement and cap securely away from electrical boxSeal hole in floor made by the pipe that was cutSecure interior stairway railing so that it is stable and does not moveIn small room behind bathroom on second floor:Remove the current damaged ceilingDestroy any mold in the ceiling cavity, provide pictures after it is cleanedInstall new drywall ceiling SECOND UNIT ADDRESSScope of WorkINTERIORRemove all current carpet throughout entire unitRemove all flooring layers including subfloor throughout entire unit excluding kitchen, including pantry rooms off of kitchenInstall new plywood subfloor everywhere flooring was removedIn small room behind bathroom on second floor:Remove the current damaged ceilingDestroy any mold in the ceiling cavity, provide clear pictures after it is cleanedInstall new drywall ceiling BOTH UNITS EXTERIORSufficiently grade the ground outside the entire building so that water poured on it will run away from the house at any point ROOFReplace metal flashing on both chimneysReplace damaged slate so as to seal all holes as observed by an interior attic/roof inspectionCLEANUPIt will be the seller’s responsibility to order contractor cleanup of worksites.COSTAll costs will be the responsibility of the seller.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/280908/small_1621441276-avatar-rohanj.jpg?twic=v1/output=image&v=2)
6 June 2017 | 12 replies
The hall and stairway are shared by all as well as the basement.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/602339/small_1695232042-avatar-brandonv13.jpg?twic=v1/output=image&v=2)
23 November 2016 | 12 replies
One for a stairway, one for a bathroom, and the third (shed dormer) to increase ceiling height for the rest of the open living space upstairs.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/662213/small_1621494954-avatar-coreys42.jpg?twic=v1/output=image&v=2)
20 November 2016 | 0 replies
I planned on renting the 2 floors (I live in first floor) for $900 each and putting a stairway connecting the basement to the first floor apartment to make it a 4 bed which would rent for about $1500 a month making my total rent income $2400 a month.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/662213/small_1621494954-avatar-coreys42.jpg?twic=v1/output=image&v=2)
28 November 2016 | 7 replies
I planned on renting the 2 floors (I live in first floor) for $900 each and putting a stairway connecting the basement to the first floor apartment to make it a 4 bed which would rent for about $1500 a month making my total rent income $2400 a month.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/422615/small_1621451082-avatar-dallasupinc.jpg?twic=v1/output=image&v=2)
4 March 2017 | 24 replies
My fiancé noticed on the virtual tour that there was a huge attic with a stairway that wasn't listed anywhere in the literature.