![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/123599/small_1621417923-avatar-miamicuse.jpg?twic=v1/output=image&v=2)
18 June 2020 | 32 replies
He also installed processes and streamlined operations, most notably implementing a computerized automated inventory system and centralizing supply orders at the Atlanta headquarters.Nardelli was credited with doubling the sales of the chain and improving its competitive position.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/365372/small_1621446892-avatar-timp13.jpg?twic=v1/output=image&v=2)
16 September 2017 | 37 replies
We had a roof with a back dormer which was a low pitch while the remaining roof was shingle.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/87709/small_1664570764-avatar-andrew_r_fidler.jpg?twic=v1/output=image&v=2)
20 February 2021 | 84 replies
We searched for a few months for a qualified contractor to repaint the top shaker shingles on the home.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/9/small_1621345214-avatar-biggerpo.jpg?twic=v1/output=image&v=2)
16 September 2011 | 29 replies
You are correct on the heat build up and shingle curl.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2575657/small_1666905954-avatar-urvashiv1.jpg?twic=v1/output=image&v=2)
18 November 2022 | 0 replies
If the roof has several layers of shingles, make sure there are no signs of sagging or warping.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1456607/small_1696963430-avatar-julietteb2.jpg?twic=v1/output=image&v=2)
14 July 2019 | 3 replies
If the seller says, "it needs a new roof", does that mean just shingles or does the decking need to be replaced, as well?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/786/small_1621345552-avatar-dafly.jpg?twic=v1/output=image&v=2)
20 February 2011 | 7 replies
One company I worked for even acquired a computerized KeyTrac system when we took over a military housing privatization project.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3073/small_1674493964-avatar-jasonscott.jpg?twic=v1/output=image&v=2)
2 March 2018 | 254 replies
For some things, it's a grey area (siding, roof shingles, trim, etc), and for that, we'll discuss ahead of time if I'll provide it or if they will -- generally, it will depend on how picky I am about the specific material being used and who gets stuff cheaper.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/416029/small_1621450186-avatar-reids.jpg?twic=v1/output=image&v=2)
14 September 2017 | 11 replies
Most of them are going to drill straight through your shingles, and most of them won't even bother siliconing the holes.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1240091/small_1668208042-avatar-courtneyr30.jpg?twic=v1/output=image&v=2)
23 March 2019 | 1 reply
Estimate Repair Cost for Baltimore City, Maryland Exterior CarpentryMetricRetail (Fix & Flip)Rental (Buy & Hold)Porch railingPer 6’ section120120Replace bandboardPer 12’ section550550Replace clapboardPer board foot$5-10$5-10Wood porchper square foot$ 25 +up $25+up$ 25 +up $25+upReplace porch supporteach$75 – 100$75 – 100Replace wood trimper linear foot$4$4Concrete WorkSidewalks (4 ft wide)per linear foot$40$40Stairsper stair$60$60Driveways (8 ft wide)per linear foot$275$275Concrete porchper square foot$ 25 – 30$ 25 – 30Retaining wallper square foot face$40$40Brick Tuckpointingper linear foot$10$10Painting – ExteriorScraping, prepping, primer, paintper square foot$2$2Minor prep, paintper square foot$ 1 - 1.50$ 1 - 1.50Paint Foundationper square foot$1.50$1.50Siding (installed with insulation and wrapping)Vinyl, stock colors, medium gradeper square$250$250Additional Storiesper square additional$50$50HardieboardPer square$425n/aReplace missing sidingper linear foot$5$5Aluminum Wrapper linear foot$10$10RoofingTear off and disposalper square per layer$100$100New deckingper 4 x 8 sheet$ 40 – 50$ 40 – 50New fiberglass shingles (dimensional)per square$200$200Each additional story after 1stper square$503 tab shingles instead of dimensionaljobN/A-$200Soffit repairPer linear foot$4$4