
5 September 2014 | 13 replies
Is it reasonable to expect tenants to take care of things (ie. not putting wet dishes and other things away in the cabinets..not banging the edges of cabinets when they put things away…not dripping water on outsides of cabinets leaving it… and things of that nature)?

12 September 2014 | 6 replies
If more info is needed just let me know.ThanksInsulation: $7,000.00 Remove, replace insulation & Ventilation in Attic and Crawl space Converting attic into bedroom, with new insulation Windows & Doors $2,000.00 Add new Sliding door in kitchen replace existing interior and exterior doors $1,800.00 replace garage door $2,500.00 Kitchen $9,000.00 Floors Cabinets Cabinet pulls/knobs Countertops Sink Facet Back splash/tile Electrical outlets Plumbing appliances Bathroom in Bedroom $6,500.00 a.

21 November 2014 | 36 replies
The Quartz counters in the bathroom and kitchen got installed today.Major Structural: -100% New Electrical (Wiring, Faceplates, Switches, Fans, Exterior Panel, LADWP feeds, etc) -100% New Copper Plumbing -New Sewer Drainage pipe to LADWP -Brand New Roof (1st layer, House&Garage) -Brand New Gas Water Heater (and moved from kitchen to outside of house) -All brand new windows -Brand New Doors -New Wood laminate floors throughout entire home -New lawn sprinkler system -Custom landscaping with new sod, colored stone, colored mulch, & plants/trees -New wood fence-Crown Moulding Install-All new baseboard installedEntertainment/Convenience Features: -New pantry -Laundry hookups in garage-LED Lighting & Bulbs Throughout -Whole Home Ethernet (Network) Pre-Wired -Living Room Sound System Pre-Installed (4x 6” Spkrs, 1x 8” Center Spkr, Subwoofer Hookup) -Living room HDMI pre-wired for wall-mount TV -6x Recessed Lights in Living Room -Each bedroom has 4x power outlets minimum -Firepit in backyard -Elevated concrete slab section for BBQKitchen: -Custom tile floor w/ pattern -Cappuccino Wood cabinets -Quartz Stone Slab Counters -Spice Racks -Trash storage drawer -Enclosed Surround for up to 36” Fridge -Recessed light over sink -Dishwasher hookupBathroom: -6ft DUAL Master Vanity -Cappuccino Wood cabinets (matching kitchen) -Quartz Stone Slab Counters (matching kitchen) -6 Storage Drawers plus 2 main under sink storages -4.5ft mirror -Custom tile floor -Custom shower/bathtub tile surround -2 Recessed Nooks w/ Interior Colored Glass

13 September 2014 | 12 replies
Like has been said, you should pay them for the bid if they don't have much chance of getting the work.The costs vary by area, but there should be pretty standard rates for painting per sq/ft, hanging Sheetrock per board, carpet per yard, hanging cabinets by box, etc.

12 September 2014 | 3 replies
So this is an easy one.I cleared all the junk from the sink cabinet out so they don't get wet when I take the trap assembly apart.

13 September 2014 | 3 replies
I am a CPA with a full time job and good credit.Facts ($’s are approximations):Home was built in 1959Home has been owned 2+ years (tax free gain on sale)Purchase price + landscaping + master bath: 180KAppraised Value: 195kARV: 230 – 250KRepairs: Refinish hard wood floors Paint Kitchen: Cabinets (refurbish used?)

17 September 2014 | 2 replies
Hello All,We are trying to bring a fresh look in the kitchen cabinets in one of our rentals.

18 September 2014 | 1 reply
There is still another 4-5 weeks remaining before completion (mainly due to the cabinet contractor being too busy).

25 September 2014 | 12 replies
Like refinishing my cabinets and re facing with bamboo.

26 June 2015 | 8 replies
I did everything from find the deal to installing kitchen cabinets, all while I was working with teams in different time zones and customer needs in my "day job".It does get better.