Derrick Dill
Investing in Philippines
1 January 2021 | 11 replies
Double or triple your budget unfortunately and that is because based on my experience some of the materials are substandard that the project manager would have to upgrade them for safety reasons (like rebar and cement quality).
Ceasar Rosas
1st Successful Flip with a 30k+ Profit
7 January 2017 | 18 replies
I eventually found a good roofer, siding guy, asphalt/cement/paver guy, all around handyman, electrician, and my granite place.
Victor Cooke
Hello from Michigan!
29 December 2017 | 14 replies
The previous owners installed cement board siding and all new vinyl windows, so a couple of framing thing and boom duplex.
Geoffrey Murphy
What was your best deal out of your RE career? & why?
20 January 2012 | 18 replies
The house had a human size chessboard, koi ponds, sand volleyball court, view.When he figured out he was losing the house, he trashed it... cement down toilets, broke shower pipes in the wall, threw paint on the cabinets, etc.
James Brand
Philadelphia Multi-family w/ garage potential
10 August 2015 | 0 replies
Hey all,I am looking at a 4plex in Philly that has a cement storage area attached.
Victoria Jonagan
Stained cement or hardwood floors in a rental property?
19 June 2014 | 2 replies
I am going to be putting in new floors in the living room and dining room of my condo, and the cost to install hardwood isn't greatly different from having someone professional stain the cement.I know the stained cement would be more durable and less maintenance, but I would like to know other pros and cons of both options.
Rob Ratch
Offering 20% of the banks listing price
19 May 2010 | 13 replies
The homeowner also poured a cement floor and built a garage over the septic system to hide it, so that was estimated to be around $50k to correct, assuming the land perc's and a system is approved.
Dan NA
OneWest Bank Takes Over IndyMac's Assests Another Short Sale Waste of Time/Rant?
13 June 2009 | 7 replies
And the other major portion of work that I saw was that the first floor cement foundation had a huge crack running the length of the garage floor.
Brandon Beatty
12 unit value add deal - looking to make some changes
12 January 2018 | 22 replies
Brandon this is about a 7-8 mos. project for us - to flip the entire building over and renovate it and get it back online with new tenant pool of occupants - I renovate as many as I can simultaneously, just set it up like a conveyer belt and move through them in sequence:*Demo team - remove all old fixtures, flooring etc, cut out all tile in whole sheets - then they set the new cement board and get the drywall hung and taped, set the new plumbing rough-in valve*Flooring and Tile team follow - get that installed with the new shoe mold on the perimeter*Painting team follows*Finish team returns for all fixture and finish install - *Painters complete touch-ups if needed *Cleaning team - BOOM!