Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (10,000+)
Joseph Sakic Thinking of changing my PM but am terrified that the process will be a nightmare
13 February 2025 | 14 replies
If they over-promise and under-deliver, transfer the next property to a different PM.
Grant Shipman 5 Reasons Co-Living is King for Real Estate Investors
29 January 2025 | 0 replies
Additionally, in Co-Living the property manager walks the property once per month to deliver toilet paper & cleaning supplies (aka property inspection). 
Matt Wan How should I vet a small lending company
27 January 2025 | 7 replies
Biggest red flag, many EXPERIENCED and NEW LOs do is overpromising and under delivering
Alan Asriants This is exactly how much it cost me to rehab a 2bed 1 bath apartment in Philly
23 February 2025 | 16 replies
. Haul away any demo/trash – Owner pays for cost of trash – contractor to provide all the receipts Pick up any/all materials for project and deliver to jobsiteKitchen Install new cabinets. Remove soffit and half wall, reposition outlets and switches. Extend half wall to match hall. Install bar island (12 inches) on half wall. Install two pendant lights above the half wall. Install new tile on kitchen floor, including floor cement board and tile. Install new appliances (refrigerator, range, microwave, dishwasher, and garbagedisposal). Run dedicated electrical lines to the refrigerator, range, microwave, dishwasher, and garbage disposal. Install faucet and cabinet hardware. Install all necessary plumbing Install backsplash. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000
Jay Hinrichs How to make a million dollars with a capital partner with subdivision entitlements
17 February 2025 | 69 replies
Sekisui House, after acquiring MDC Holdings, has become the fifth-largest builder with an estimated 15,000 homes delivered annually.
Andrew Bosworth Best current commercial lending options for small/mid-sized apartments?
19 February 2025 | 13 replies
Any unit rented at a level <=80% AMI is considered to be a “Mission Driven” naturally affordable unit.For example, say you’re buying a 10-unit property consisting entirely of 2-bedroom units in an area where the 80% AMI (Mission Driven) rent cutoff for 2-bedroom unit types is $2500.
Grant Shipman Do you believe that Co-Living investment is the fastest way to financial freedom?
1 February 2025 | 17 replies
Rent by room / house hacking / co-living should deliver significantly higher cash flow than a traditional rental. 
Mary Jay Cash flow is a myth? Property does not cash flow till its paid off?
19 February 2025 | 88 replies
I have tons of clients with 3/4 units that also hit similar returns consistently after the first year or two.  
Damon Diddit Inheriting a problem tenant after closing
31 January 2025 | 8 replies
He delivered a 60 day notice to quit, to tenant.
Shea Gajewski Young Investor Seeking Advice
3 February 2025 | 5 replies
A cash-out refinance or home equity line of credit (HELOC) can be powerful tools to keep your momentum going.Focus on Stability:Look for investments in areas with strong job markets, population growth, and consistent rental demand.