Chris Hertig
Tenant Living in Garage/Shop!
14 January 2025 | 4 replies
All this in addition to 6 other lease violations...
Desiree Board
Sole proprietor, LLC or Corporation?
22 January 2025 | 3 replies
Avoid C-Corps, as they incur double taxation.Use LLCs for rentals and consider an S-Corp election for flips if income justifies the additional complexity.This post does not create a CPA-Client relationship.
Gamal Harding
Columbus Lands Another Large Tech Firm! 4000 Plus Jobs Coming
18 January 2025 | 7 replies
JobsOhio projects that, indirectly, approximately 4,500 additional jobs will be created by 2035, further amplifying this effect.Implications for Real Estate DemandThe substantial increase in the workforce will drive demand for both rental and owner-occupied housing.
Brett Henricks
Crew Enterprises DST Investors with suspended distributions please PM me
21 January 2025 | 3 replies
I'm curious if there are additional distressed Crew DSTs out there.
Ernest Ho
Emotional Support Animal / Service Animal
19 January 2025 | 18 replies
When it comes to housing, the FHA rules apply in addition to those of your state/city.
Logan Rhea
Thoughts if this property flip Scope of work is too low
23 January 2025 | 5 replies
Paint rags and paint plastic $386.66 Initial 70% deposit Cabinets $13,029.02 Backer board, Fiber rock, Shower drains, Zinc backer board screws $385.71 Junk Removal $600.00 red gard ($123.10) Initial 50% deposit Windows $10,493.20 2x4 studs $52.33 Junk Removal $400.00 Flooring sample $6.01 Flooring sample $68.48 Flooring sample $62.62 Flooring sample $132.09 Paint samples for accent wall $38.34 10% Draw for Master bathroom demo $580.00 Wall and shower Tile+Grout-Guest bath $528.62 LVP Flooring $7,165.27 Demo Work $1,275.00 LVP Flooring $7,198.07 Floor tile-Guest bath $889.05 50% down for moisture barrier and animal extraction $2,541.30 Returning flooring samples ($263.19) Paint-2 5gallon buckets SW $382.38 Unsure on what these are $19.54 Unsure on what these are $48.00 Master shower floor tile $331.42 Paint $3,100.00 Flooring underlayment $888.42 Primer $178.71 Paint-5 1gallon buckets SW $180.26 Paint $3,100.00 Appliances $6,820.59 Master bath tub $986.76 Paint-1 5gallon buckets SW $194.81 Primer $268.54 Framing repair for rotted wood $1,000.00 Junk Removal $500.00 Floor tile-Guest bath $771.07 Floor and Shower wall tile-Master $4,559.43 Stair noses $334.20 Master shower floor tile $612.76 Farmhouse sink $385.91 Master ceiling paint $254.29 Drywall repair in kitchen ceiling $500.00 Childrens wall tile and floor tile $3,477.40 Master shower floor tile-Return ($331.43) Drop in sinks for children's bathroom $103.75 Drop in sinks for upstairs bathroom $51.87 Master sinks $147.64 Master floor tile $270.05 Electricity $169.70 16x cement backer board return ($139.60) Tub and shower faucets $414.96 4 x Toilet seats $788.22 Tile install materials for all bathrooms $863.00 Air filters $10.90 Gas pipe and AC tune up+Duct repair $1,216.00 Tile install materials for all bathrooms $984.78 Roll of insulation X2 $38.48 Primer refund $125.33 Shower faucets X2 $480.71 Water $11.41 Master shower floor tile-Return the original white one ($261.55) Demo and materials he bought $1,005.14 Pickup charge for picking up flooring $223.96 Flooring 1st payment $4,000.00 Flooring return-guest bathroom tile ($889.05) Red guard refund $71.34 Backer board, wall tile and floor tile upstairs master return ($134.34) Keys X3 $10.93 Remaining balance for moisture barrier $2,046.30 Subfloor repair $100.00 Flooring $9,900.64 Master tub filler faucet $311.35 Tile labor in all bathrooms $9,202.22 Stair treads and risers $1,160.76 Bathroom painting $2,000.00 Junk Removal $150.00 Return for stair noses ($334.20) Return for flooring ($13,488.73) Flooring $1,900.00 Flooring underlayment $899.35 Trim $1,053.17 Toilet supply lines $13.46 Tile sealer, garage epoxy, garbage disposal $313.00 Return for remaining balance ($1,098.57) Floor reducer $49.99 Garage door opener $267.66 Door hardware (Hinges and door handles) $451.14 Counter tops $5,287.01 Tile return ($981.43) Tile return ($685.14) Tile return ($385.53) Tile return ($153.19) Tile return ($613.13) Flooring $1,900.00 Plumbing and electrical work (Light fix, toilets, drains) $975.00 Light fixtures and faucets $975.49 Junk Removal $125.00 Baseboards $241.45 Switches, outlets, faceplates $234.53 Cabinet balance $5,583.86 Sink return ($155.62) Dining room light and 4 ceiling fans $923.70 Anti skid additive for garage floor $11.38 Flooring $1,900.00 Glidden gel paint $24.01 Paint refund ($1,046.40) Counter tops $2,304.23 Extension rods for ceiling fans $40.64 3 Ceiling fans (one was returned) $573.93 Return grills $100.11 Kitchen and nook light fixtures $283.80 Rod for curtains and toilet paper holder $84.10 Curtain rods $54.60 Garage door deposit $1,185.00 Cleaning $400.00 Water heater $756.18 Thermostat $181.41 Stump Removal $300.00 Dryer cord $28.53 Plumbing and electrical work (Light fix, toilets, drains) $3,525.00 Junk Removal $125.00 Grass seed $71.40 Return of shipping cost ($297.45) Duct cleaning $970.00 Drains for master $46.54 Sold Fridge ($200.00) Bathroom fans $91.92 Samples for brick $29.98 Peg board hooks $20.83 Wall plate covers $21.28 Steel pegboards $140.72 Return stair tread and Riser ($198.14) Pressure washing $1,216.00 Wall plate covers $8.11 Shower door for upstairs $729.83 Powder room counter top $702.99 Light bulbs $59.24 Shower door deposit $1,000.00 Staple gun, staples, supply lines $157.04 Bathtowel hanging hardware $130.89 Light bulbs $29.62 GFCIs, underlayment, downrods ($233.54) Sanding pads $59.10 Yard hanging tools $21.94 Supply line return ($13.12) Stair clips and balusters $779.58 Returned some bathroom tile ($109.05) Peg board hooks $120.04 Front door $3,235.01 Brick sealer $50.81 Bathroom fan light and peg board hooks $71.27 Sanding pads, sanding sheets, etc $38.48 Mirrors $65.84 Mirrors $291.88 Spray bottle for marble sealer $4.34 Brick backsplash $695.54 Sanding pads $2.20 Shelves and shelf brackets for storage room $73.14 Shower door balance $1,000.00 Mirrors $104.26 Returned mirrors ($89.50) Gutters $2,043.15 Floors for finishing room $373.78 Wall plate covers $8.07 Floetrel and hood vent $31.49 Plumbing and electrical work $175.00 Backsplash and fireplace $2,450.00 Trim paint $50.21 Tile for master finish $15.17 Returned something.
Lisa Albright
Rehab personal home taking funds from rental property equity
13 January 2025 | 8 replies
Quote from @Lisa Albright: Hi All,Newbie here, just a quick question we are building an addition on our second home, we have a primary residence, and two rental properties.
Chris Blackburn
Tax credit 45L for a 90 unit or 112 unit project? What should it cost?
22 January 2025 | 1 reply
This could cost around $500 to $1,500 per unit, depending on the size and complexity of the project.Certifications: There may be additional costs for certifications (such as HERS ratings) or third-party testing to verify the energy efficiency of each unit.For a 90-unit project, you could be looking at costs in the range of:$45,000 to $135,000 for energy modeling and certification (depending on the cost per unit).For a 112-unit project, the costs would likely be:$56,000 to $168,000 for similar services.Tax Credit Calculation:If you meet the energy standards, you can claim up to $2,000 per unit.
Carter Fleck
Keeping My Finger on the Pulse of the Property Management Industry – Seen any sales?
24 January 2025 | 1 reply
Additionally, many deals tend to fly under the radar, so networking within organizations like NARPM (National Association of Residential Property Managers) can help uncover opportunities.If anyone reading this is considering selling their property management company in Texas, feel free to share—I’m genuinely interested in connecting.
Sidney Duquette
Strategies for High Equity Growth Properties: Risk Mitigation, Value-Add, Cash Flow
20 January 2025 | 7 replies
The additions are usually small.Buy focusing on real high value places, you are putting yourself in a narrower guest pool.