
16 July 2013 | 8 replies
The smell was so bad in the fridge that it made me throw up.

22 July 2013 | 12 replies
We include stove and fridge, and when they break down, we buy used from a local used appliance store right away.

24 September 2013 | 31 replies
- Clear fridge of all magnets- Clear all kitchen and bathroom counters (you really don't want your toothbrush out for pictures)- Remove pet bowls, toys, and beds before showing - Store kid's toys - keep a laundry basket of toys that can quickly be put in car when you leave house (works great for toddlers)- take out the trash- Do not leave 14 bottles of soaps and stuff in bathtub-Store gun cabinet so people do not remember your house as the house with guns- People look in medicine cabinets - don't leave meds that may leave an impression in view- Organize pots and pans - store the bunt, angle food cake pans, waffle iron, fryer and other large items not used often to clear out room- Clean Clean Clean (especially light switches, door knobs and other areas that hands are always on

4 August 2013 | 7 replies
The "Ohana" units can have a kitchenette including a microwave, fridge and hotplate but but not a range.

11 August 2013 | 8 replies
My beer-and-bait fridge in my basement is over 20 years old and still running fine.

2 May 2014 | 74 replies
Throw a few drinks in the fridge and encourage applicants to have a drink, sit down and fill out the papers.

14 April 2015 | 6 replies
You may not want to spend $200 repairing a 10 year old fridge.

16 November 2014 | 11 replies
Recently, we had some random, extreme electrical problem that were causing bulbs to burn out, outlets to burn out, killed the fridge, and their ceiling fan literally started sparking.

2 January 2015 | 10 replies
Haven't priced it out yet but I will probably pay between $2-$2.5k- sink $200, - faucet - $200, - backsplash $300 install, another $300 materials- I usually add canned lights in kitchen ~$80 per,- Flooring: If tile, I buy the $1 per sq ft ceramic so materials are cheap ($150), labor for that may be about $1k for a decent sized kitchen / If I do engineered wood, then about $2.50 per sq ft for materials and $2-$2.25 for installation- Appliances: about $1k, I don't provide fridge, just dishwasher, stove, microwave- Plumbing hook up - ~$250Bathroom:- I have had to demo walls before due to tile, so probably $300-$400 for new drywall if that is the case- Tile shower - probably around $250 for materials and $750 for labor (including cement board installation).

9 June 2015 | 29 replies
(fridge reimbursed fully.