Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (632)
Ed O. Egress standards
27 June 2012 | 3 replies
jon is right...the min measurements are for a fireman to be able to enter and exit. when you cut the concrete, you have to use a lentil or a header on top. also, tie the storm drain pipe to the weeping tile around the house. then fill with 3/4" gravel. bolt the well to the house with anchors. fiberglass wells or galvanized are the two options. then needs a cover.i quoted it for my house... it would cost between $1500 and $3500, depending on the style/size, etc..
Ryan Thomas Can someone confirm if this wall is load bearing?
2 May 2018 | 7 replies
I am assuming it is not because there is no header running across the ceiling to the right of the wall.
Brandon Turner Do You Submit a Letter of Intent with a Bank REO offers?
1 August 2016 | 6 replies
So my theory is that including a nice letter, (with maybe my wife and my picture in the header or footer,) might persuade someone to accept a lower offer?
Marie S. Seller still running rental Ads
18 June 2013 | 6 replies
Let's say that the leases in place stretch 2 and a half pages with large font and double spaced with headers.
Joe C. My Venture Into Marketing for Deals
25 July 2013 | 5 replies
H tages = header tags?
Jav Caprietta Can anyone tell if this is weight bearing?
27 January 2016 | 25 replies
The cost of doing so most likely will not be worth it, but an opening can be accomplished much easier using headers sized properly. headers can also be designed too suspend a ceiling but not if you have a second floor unless there is another wall directly above your opening.
Mike Kroupa Curb Appeal Suggestions – Lake House
1 October 2017 | 25 replies
I did not show the new door in the mock-ups.I am including three images.The house as it is todayA rough mock-up with three windows in the main front wall.A rough mock up with two windows in the main front wall – but with “headers” above the windows.Note: The colors are not correct.
Dan Settle Wall removal
3 February 2014 | 4 replies
Address the outlet(s).Even though it's not load bearing, you'll need to frame a header with supports for the span.
Jacob Edmond Renovating 60s Brick Ranch. Layout questions
19 October 2015 | 3 replies
It also turns out to be structural, so I'm going to have to put a header and column to support this across where we want to put an island.
Oscar Martins Building department doesnt like it when i do my own repairs
11 December 2013 | 55 replies
I had to have full architect drawings of the entire property, provide a copy of my survey, ect all to change a header that had rotted out on a back porch.