
6 March 2024 | 25 replies
I have a free video and slides on how to find that data that I did a presentation at a local REIA group and my wife recorded it on her iPad if you want to connect with me if that is the kind of data you want.

7 March 2024 | 5 replies
What I see as an operator and investor down here is many people ignoring HOA rules and trying to slide by and do shorter term rentals even when buildings don't allow it.

8 March 2024 | 17 replies
Your contract should have a due diligence/inspection period that allows you to walk away with your earnest money but if you miss that window you could be out whatever you put as EMD.

7 March 2024 | 10 replies
Even with holes/tarp on roof and plywood over windows, the place still smelled like smoke.

7 March 2024 | 2 replies
You should first make certain every place someone can enter, like doors and windows, are well locked.

7 March 2024 | 7 replies
I tell them it's just a formality, even though it is ordinarily the beginning of an eviction process.In the lease they give me the right to advertise the unit for lease 30 days in advance online, with a yard sign, and with a sign in the window.

5 March 2024 | 11 replies
.- Install new windows throughout (18), install new trim and replace rotted or damaged framing as necessary.- Install new white vent covers throughout.- Install (brushed nickel?)

5 March 2024 | 27 replies
I ask because IMO dressers are by far the hardest thing to shop for that checks all the boxes (quality slides, deep drawers, looks nice) without breaking the bank, which multiplied by several bedrooms can really add up.

6 March 2024 | 8 replies
The dimensions are 6'x11' with a small window and closet that takes up 3x3' of that space.
7 March 2024 | 14 replies
After all is accepted by the Housing Authority with the booklet, they will schedule an inspection where they come out and check a list of items including looking for peeling paint, windows open/close/lock, smoke detectors /co detectors / fire extinguishers all in the right locations, GFI receptacles in the correct locations, grounded receptacles if 3 prong (ground not needed if 2 prong), and the list goes on.