
28 January 2025 | 12 replies
Feel free to reach out if you need any assistance or have any questions!

23 January 2025 | 5 replies
feel free to message me.

30 January 2025 | 7 replies
You might want to check out the Detroit Land Bank Authority, which sells rundown properties at super low prices—as long as you commit to renovating them.

28 January 2025 | 0 replies
Just like how Johnson & Johnson or Coca-Cola send you quarterly dividend checks, your tenants are sending you monthly "dividends" in the form of rent.

21 January 2025 | 13 replies
That said, Detroit is very much a block-by-block city, so local knowledge is critical to avoid issues.If you’re serious about learning more, feel free to send me a DM.

14 January 2025 | 329 replies
Why pay rent when your landlord gives you free housing, free maintenance team, free mortgage, free electricity, free water, free trash?

25 February 2025 | 23 replies
Less mistakes, connections for materials, lower contractor prices,etc)If you want to check out the full scope of work you can see it BELOW 👇 General Work Remove all old carpet and dispose of it. Install new laminate or vinyl flooring. Screw down all floors and level them to prepare for laminate. Remove existing baseboards and install new baseboards. Install new decor outlets and light switches. Secure all ceiling sheetrock, spackle, and paint. Sand, spackle, and paint the entire apartment. Sand and paint all doors. Install hardware on doors. Adjust and fix any closet hangers and shelves. Paint all closets and install secure wooden shelving. Install blinds on all windows. Install curtain rod on balcony door. Haul away any demo/trash – Owner pays for cost of trash – contractor to provide all the receipts Pick up any/all materials for project and deliver to jobsiteKitchen Install new cabinets. Remove soffit and half wall, reposition outlets and switches. Extend half wall to match hall. Install bar island (12 inches) on half wall. Install two pendant lights above the half wall. Install new tile on kitchen floor, including floor cement board and tile. Install new appliances (refrigerator, range, microwave, dishwasher, and garbagedisposal). Run dedicated electrical lines to the refrigerator, range, microwave, dishwasher, and garbage disposal. Install faucet and cabinet hardware. Install all necessary plumbing Install backsplash. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000

22 January 2025 | 12 replies
Feel free to message me if you want to chat about it

11 February 2025 | 7 replies
I tend to agree that we could be over leveraging ourselves and your comments are a good reality check but I did not paint the whole picture.

23 January 2025 | 3 replies
Hey I am an agent in Salt Lake, if you haven't already run comps feel free to reach out and I can send them over to you.