17 June 2024 | 2 replies
The renovation is significant (flooring, counters, heating, upgrading the bathrooms, etc.), but not a complete remodel (not adding or expanding structures).

17 June 2024 | 4 replies
At one point a plumber checking a toilet leak identified subfloor damage requiring the bathroom floor to be taken up and repaired.

16 June 2024 | 1 reply
Hi,I have a turnover for a property in Memphis TN, and there's a bit of extra work that needs to be done in addition to standard wear and tear, some bedroom doors need to be replaced, blinds, patching, painting, some floor tiles etc....I got an estimate, and I know everything is costing more these days but it feels a bit aggressive.

17 June 2024 | 13 replies
She gave me a very vague list of work completed with numbers ("dent to woodwork $," "Paint, $," "Hardwood scratched $" etc), but I cannot match any work done in the house with the list.

16 June 2024 | 6 replies
I'm having a hard time finding contractors who can handle the framing portion of the project (flooring joists, laying subfloor, walls, roofing system) who aren't also general contractors.

16 June 2024 | 1 reply
I have seen a lot of floor plans that are actually very nice and form the inside you cannot even tell its a MFH!

15 June 2024 | 8 replies
The ceilings in the basement are a hair over 7' (full size door fits), and trying to understand whether to duplex down my first floor unit and go from 3/1 to 4/2 bed/bath legally.

15 June 2024 | 5 replies
I was thinking your floors should be last so they dont get damaged while all the work is getting done.

15 June 2024 | 11 replies
I suspected that 1st floor condos don't get too much love, but since this condo doesn't have an elevator, I figured it would be easier to move furniture into.

15 June 2024 | 2 replies
(My company has it’s general liability insurance, of course.)So, this is a temporary arrangement, at least for now.He will charge a fee to pull permits and to do periodic inspections to make sure my subcontractors are doing quality work but I will be project managing the entire job and handling all components of the renovation from design, floor plans, estimating, purchasing, hiring and overseeing the subcontractors, etc.The general contractor and I are regrouping next week to discuss what he would like to charge and I just want to get some feedback from you experts before we meet.