
22 April 2024 | 28 replies
Ex: If a tenant calls up to complain that their drain is broken or running slow, or that a light fixture needs replacement, or to spray the Apt with insecticide, or to fix a broken door-lock or window frame, or anything of the like such as the fast repairing, touching up, painting & cleaning needed during a turnover between Tenancies...

25 April 2024 | 93 replies
The home was mostly turnkey, but we painted the interior and exterior (we always wanted a black home) and provided all new light fixtures and furniture.

22 April 2024 | 8 replies
I have a painting business and my partner has a construction business in nyc and we've already been doing jobs in CT. as for time I have loads of time on my hands and I am pretty handy my self.
29 April 2024 | 248 replies
meaning painting the exterior LOL.

22 April 2024 | 10 replies
Share leases, co-op on painting, etc.

22 April 2024 | 2 replies
Examples included missing paint and rotting siding.

22 April 2024 | 18 replies
Correct, I have housemates to help with living expenses; however, I am not really using the BRRRR method because my renovations are cosmetic (changing light fixtures, furniture, paint, small fixes).

22 April 2024 | 12 replies
I did take an extra day between my last guests because we had to swap out a water heater and do some touch up painting.

21 April 2024 | 17 replies
Maybe little signs or spray paint numbers?

20 April 2024 | 6 replies
New LVP flooring upstairs to replace all the carpet, new cabinets and countertops in the 2.5 bathrooms, new fiberglass shower in the guest bathroom, new walk in shower (tiled) in the master bathroom, next lights/sinks/faucets/toilets/etc in all bathrooms, new paint on kitchen cabinets, new pulls on kitchen cabinets, new ceiling fans throughout, and fresh paint throughout.