
28 June 2024 | 29 replies
Does the construction material (frame, vinyl siding, etc.) matter?

26 June 2024 | 14 replies
But you also have to track your material participation time in your property(s) if you're trying to qualify to use your real estate tax loss to offset your other income.

28 June 2024 | 17 replies
that's why I am doing this forum to keep me accounted for my actions)So... for this week, I think I will put more effort into finishing the two books, "asking questions the Sandler way, and "Prospect the Sandler way", finish all the onboard materials for Exp, attend the team meeting, set up social medias, watch the videos I marked up on the "subto" training vault

28 June 2024 | 41 replies
In the next couple months, we are demolishing the rental houses and building metal buildings/flex space with many units that we will lease out to many tenants.

30 June 2024 | 54 replies
Agreed, though it takes other stuff for builders to step in-- material prices, labor availability, etc.
28 June 2024 | 13 replies
Tenant also agrees to the following:-All drains, waste pipes, and plumbing are accepted as clear by Tenant at the time of occupancy, and any material blocking them after occupancy shall be repaired at Landlord’s cost, unless determined by repair person that such blockage occurred during the time Tenant controlled the Premises and due to some fault or negligence of Tenant, specifically excluding blockages caused by roots or backups from the street.

27 June 2024 | 11 replies
I redid a galley kitchen using ikea cabinets and I ended up paying more than 5k in materials (oven, stove, dishwasher, refrigerator, cabinets, countertops, backsplash, sink, faucet) That was before the pandemic.

26 June 2024 | 1 reply
She ended up picking out material that was over the top and we could have saved some money.

26 June 2024 | 9 replies
Although AB-968 doesn’t specifically mention “licensed” contractors, the state of California already stipulates that “anyone who contracts to perform work that is valued at $500 or more in combined labor and materials costs must hold a current, valid license from CSLB” (source: CSLB).With AB-968, if work is performed by an (un)licensed contractor in an amount that exceeds $500, disclosing that entity’s or individual’s name and contact information becomes a legal requirement.

27 June 2024 | 20 replies
The material costs for painting a wood floor will be under $100.