
15 June 2024 | 8 replies
Additionally, 14B-2-202 Defines a Basement as:“Basement: A story that is not a story above grade plane.”Additionally, 14B-6-605 notes:“Except in buildings of group R-5 occupancy, floor construction over basements shall have afire-resistance rating of not less than 1 hour.”This means that if you are Very close to missing the 7'-0" mark, you can leave the ceiling unfinished and measure from the floor finish (a thin LVT or Vinyl tile would be recommended) and the Underside of the Joist.Note: Rooms containing gas-fired appliances (i.e.

14 June 2024 | 3 replies
Purchase price: $Cash invested: $Completely renovated SFH, 3/2, built in 1999, 1214 sq ft with a new roof installed in April 2024, state-of-the-art smart LG appliances, and luxury vinyl plank flooring throughout.

14 June 2024 | 1 reply
The high rate of electric vehicle charging installation and solar installations are making these kinds of electrical parts hard to find.

14 June 2024 | 28 replies
I have a 6 bedroom septic installed on the lot and in the future will add an additional cabin.

9 June 2024 | 14 replies
Cutting tiles can be a challenge if you have angle and corner pieces but a basic install isn't too hard.

15 June 2024 | 30 replies
Lastly, when i try and call them to speak to my property manager 99% of the time I wind up having to submit a note in their portal and wait for a call back.As to to the new garage door that will be installed by the tenant, I wish they would be more involved, giving the tenant some options of companies to call, and to walk them through the repair process.Am i wrong in any of these thoughts or concerns about my current PM---or---do i need to let the property manager do their thing and learn to take a step back?

16 June 2024 | 23 replies
Install world class security/camera alert systems3.

14 June 2024 | 2 replies
Please provide the necessary documentation no later than [DATE/TIME] or confirm your intent to terminate the current lease and vacate no later than [DATE/TIME]"That's a very simple example, but gives you an idea.I also recommend you make tenants responsible for improvements, that they be at tenant cost, and that installation and/or removal be done professionally with receipts as proof.
14 June 2024 | 6 replies
The cleaner he sent used some type of cleaning solution that stained my bathroom tile and sink countertops.

13 June 2024 | 7 replies
Pay in more frequent installments?