![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/63108/small_1621413328-avatar-wgaston14.jpg?twic=v1/output=image&v=2)
21 November 2024 | 305 replies
That pissed those tenants off something fierce (naturally we were getting blamed for it) and on top of it, it was difficult to show the property to groups as construction work was going and the feedback from the current tenants to prospective tenants was poor.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3093546/small_1734143772-avatar-garrettbrownre.jpg?twic=v1/output=image&v=2)
2 November 2024 | 8 replies
The numbers back him up— His construction costs are around $200,000 a unit, and his units pull in $600+ ADRs and hit 83% occupancy, with NOI per unit up to $100,000, rivaling 5-star hotels.Financing these beautiful properties?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3074311/small_1727959028-avatar-briand794.jpg?twic=v1/output=image&v=2)
31 October 2024 | 12 replies
Both are in a small market in Illinois, where I have family involved in real estate and construction, so it’s been a great way to jumpstart my multi-family journey.As I'm looking to expand, I’m particularly interested in out-of-state investing, since the DC area where I live is a bit too expensive for my investment goals.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2696367/small_1712855967-avatar-cynthial93.jpg?twic=v1/output=image&v=2)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/185375/small_1621431749-avatar-whinshaw.jpg?twic=v1/output=image&v=2)
8 November 2024 | 31 replies
How did you go about constructing a lease for a sober living home vs a traditional residential lease?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/225309/small_1621434483-avatar-derobj.jpg?twic=v1/output=image&v=2)
29 October 2024 | 1 reply
Hi all,I'm under contract on a home in Cleveland Heights and inspector suggested a structural engineer look at a few things.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3071764/small_1720572093-avatar-chrisc1725.jpg?twic=v1/output=image&v=2)
31 October 2024 | 1 reply
I'm particularly passionate about cash flowing for financial independence and renovating with my construction experience.Outside of real estate, I enjoy fishing, ultimate frisbee, skiing.Excited to learn and connect with you all!
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3108798/small_1736472838-avatar-tylerk344.jpg?twic=v1/output=image&v=2)
31 October 2024 | 10 replies
If you don't know what you are doing, you are going to outsource every part of the process from agent to inspector to property manager and you won't be connected to the property.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3021980/small_1715642116-avatar-ians304.jpg?twic=v1/output=image&v=2)
31 October 2024 | 8 replies
You need to make sure your product isnt directly competing with all the new construction units tbh at have come or will be coming online soon.
30 October 2024 | 1 reply
Hello, I own a plumbing company with 40 + employees and mostly work under contractors that do remodel, new construction and commercial work.