![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/901636/small_1695259633-avatar-ivans33.jpg?twic=v1/output=image&v=2)
7 November 2024 | 15 replies
Food in fridge is from April this year and it basically looks like someone was half way through moving out and then something happened and so a bunch of stuff is still in house. specifically one room filled with about 10 burner phones, 3 tvs, personal clothes, mail, kids personal items and bunch of random stuff new with tags, etc etc. he also had pets which was against lease term. one of the rooms was used as a pet room completely destroying carpet and staining walls with urine etc.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3052597/small_1718650214-avatar-williamh807.jpg?twic=v1/output=image&v=2)
5 November 2024 | 22 replies
Cleaning carpet and paitning is all that is needed.btw.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2696367/small_1712855967-avatar-cynthial93.jpg?twic=v1/output=image&v=2)
31 October 2024 | 4 replies
Client Name: Property Adddress: Current Property Type: Post Rehab Property Type: Level of Finishes: List Structural Changes: Final Bed/Bath Count: Exit Strategy (sell or refinance): PHASE 1: PRE-CONSTRUCTION Original Amount Net Adjustments Adjusted Total Description Drawings $ - $ - $ - Permits $ - $ - $ - Expeditor $ - $ - $ - Alarm/Security $ - $ - $ - Temporary Fencing $ - $ - $ - Portable Toilets $ - $ - $ - Engineering Fees $ - $ - $ - Architectural Fees $ - $ - $ - Utilities $ - $ - $ - TOTAL PRE-CONSTRUCTION $ - $ - $ - PHASE 2: DEMOLITION Original Amount Net Adjustments Adjusted Total Description Interior Demo Exterior Demo Dumpsters TOTAL DEMOLITION $ - $ - $ - PHASE 3: CORE AND SHELL Original Amount Net Adjustments Adjusted Total Description Excavation $ - $ - $ - Foundation $ - $ - $ - Underground Plumbing $ - $ - $ - Drain Tile $ - $ - $ - Sump Pump $ - $ - $ - Steel $ - $ - $ - Floor Joists $ - $ - $ - Subfloor $ - $ - $ - Rough Carpentry $ - $ - $ - Interior Stairs $ - $ - $ - Dormer $ - $ - $ - Roof Masonry Siding Windows Exterior Paint Soffit/Fascia Gutters Landscaping Walkways Exterior Doors $ - $ - $ - Exterior Stairs $ - $ - $ - Porch $ - $ - $ - Deck $ - $ - $ - Driveway $ - $ - $ - Garage TOTAL CORE AND SHELL $ - $ - $ - PHASE 4: HVAC Original Amount Net Adjustments Adjusted Total Description HVAC Rough Furnace Condensing Unit & Lineset $ - $ - $ - HVAC Trim $ - $ - $ - TOTAL HVAC $ - $ - $ - PHASE 5: ELECTRICAL Original Amount Net Adjustments Adjusted Total Description Electrical Rough $ - $ - $ - Electrical Finish & Fixtures Low Voltage TOTAL ELECTRICAL $ - $ - $ - PHASE 6: PLUMBING Original Amount Net Adjustments Adjusted Total Description Water Service Upgrade $ - $ - $ - Sewer $ - $ - $ - Plumbing Rough $ - $ - $ - Water Heater $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - TOTAL PLUMBING $ - $ - $ - PHASE 7: DRYWALL AND DOORS Original Amount Net Adjustments Adjusted Total Description Insulation $ - $ - $ - Drywall, Tape, Sand $ - $ - $ - Finish Carpentry (Trim) $ - $ - $ - Interior Doors $ - $ - $ - Interior Paint $ - $ - $ - TOTAL DRYWALL $ - $ - $ - PHASE 8: FLOORS Original Amount Net Adjustments Adjusted Total Description Hardwood Floors $ - $ - $ - Tile Vinyl Carpet $ - $ - $ - TOTAL FLOORS $ - $ - $ - PHASE 9: KITCHEN Original Amount Net Adjustments Adjusted Total Description Cabinets Countertops Backsplash Plumbing Fixtures $ - $ - $ - Light Fixtures Appliances TOTAL KITCHEN $ - $ - $ - PHASE 10: BATHROOMS Original Amount Net Adjustments Adjusted Total Description BATHROOM # 1 Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 1 $ - $ - $ - BATHROOM # 2 Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower Tile Vanity Countertop Plumbing Trim & Fixtures Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 2 $ - $ - $ - BATHROOM # 3 - Basement Original Amount Net Adjustments Adjusted Total Description Tub $ - $ - $ - Shower $ - $ - $ - Tile $ - $ - $ - Vanity $ - $ - $ - Countertop $ - $ - $ - Plumbing Trim & Fixtures $ - $ - $ - Light Fixtures $ - $ - $ - Glass & Mirrors $ - $ - $ - Bath Accessories $ - $ - $ - TOTAL BATHROOM # 3 $ - $ - $ - **Please add itemization of work for additional kitchens or bathrooms** PHASE 11: OPTIONAL Original Amount Net Adjustments Adjusted Total Description Other $ - $ - $ - Fireplace $ - $ - $ - Final Cleaning Staging Stucco Closets General Contractor Fee $ - $ - $ - Finish Carpentry $ - $ - $ - Underpinning $ - $ - $ - Footers $ - $ - $ - Contingency $ - $ - $ - TOTAL OPTIONAL $ - $ - $ - Total Estimated Cost of Repairs $ - $ - $ -
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/373211/small_1621447414-avatar-craigd5.jpg?twic=v1/output=image&v=2)
1 November 2024 | 8 replies
I think Navajo White and white goes well with renters tan carpet in some bedrooms in some rentals.I did A study mockup of @Johann Jells beautiful bay window room in close to those colors.Windows like that to me seem very calming and serene, especially upstairs I like them (which was my motivation to re color the pic a little.And if you want you can picture me sitting in one of those chairs with a cup of coffee and a good book--because that is where I'd probably be.Good Luck!
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1767634/small_1661637371-avatar-nolanf7.jpg?twic=v1/output=image&v=2)
3 November 2024 | 24 replies
And most will be able to pay the taxes when they come due, and put on a new roof, and put on a new coat of paint.As well as replace the carpets, cut the grass on a regular basis, replace the windows, reseal the chimneys when the liners crack, etc..It's unlikely that that these homes will fall into the slum category in 10 years or so, and make the asset underlying the loan virtually worthless.Or just vanish when the place starts to fall apart too much, due to no down-payment (no skin in the game 100% loans).Said the lawmakers who approved this.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2318201/small_1642719728-avatar-danield673.jpg?twic=v1/output=image&v=2)
30 October 2024 | 1 reply
Current plan is to rip out the carpet, it's trashed, and replace with LVP (one of the four colors, not sure which is best to choose... see attached image), replace the laminate counter with granite.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2375357/small_1694824658-avatar-islaa.jpg?twic=v1/output=image&v=2)
23 October 2024 | 13 replies
When I first started I had new carpet in the house.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/3134976/small_1729300973-avatar-jessed203.jpg?twic=v1/output=image&v=2)
28 October 2024 | 4 replies
I really liked finding the probate houses there, which often have great structure and outdated paint/carpet.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/156960/small_1621420028-avatar-shahmat.jpg?twic=v1/output=image&v=2)
2 November 2024 | 64 replies
Use wood, tile, or carpet.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/9011/small_1621348727-avatar-jgonzalez.jpg?twic=v1/output=image&v=2)
29 October 2024 | 0 replies
Assets identified in this study include:Kitchen Appliances: Refrigerator, microwave, garbage disposal, range hood and dishwasherLaundry Appliances: washer and dryerElectrical and communication systems: Specialized equipmentCustom Cabinetry, Countertops and shelvingInterior Finishes: wood flooring, carpet, and decorative light fixtures.61.64% of the total depreciable basis was classified as 27.5-year class life.