
22 February 2025 | 10 replies
The current market rent for his apartment is about $1700.

31 January 2025 | 8 replies
I am happy to steer you in the right direction and give you some guidance if you need it.

24 February 2025 | 20 replies
Less mistakes, connections for materials, lower contractor prices,etc)If you want to check out the full scope of work you can see it BELOW 👇 General Work Remove all old carpet and dispose of it. Install new laminate or vinyl flooring. Screw down all floors and level them to prepare for laminate. Remove existing baseboards and install new baseboards. Install new decor outlets and light switches. Secure all ceiling sheetrock, spackle, and paint. Sand, spackle, and paint the entire apartment. Sand and paint all doors. Install hardware on doors. Adjust and fix any closet hangers and shelves. Paint all closets and install secure wooden shelving. Install blinds on all windows. Install curtain rod on balcony door. Haul away any demo/trash – Owner pays for cost of trash – contractor to provide all the receipts Pick up any/all materials for project and deliver to jobsiteKitchen Install new cabinets. Remove soffit and half wall, reposition outlets and switches. Extend half wall to match hall. Install bar island (12 inches) on half wall. Install two pendant lights above the half wall. Install new tile on kitchen floor, including floor cement board and tile. Install new appliances (refrigerator, range, microwave, dishwasher, and garbagedisposal). Run dedicated electrical lines to the refrigerator, range, microwave, dishwasher, and garbage disposal. Install faucet and cabinet hardware. Install all necessary plumbing Install backsplash. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000

16 January 2025 | 1 reply
Below are a few areas and things to look for if you're exploring investing in an AirBnB on the Oregon Coast.Most notably, the heart of the Oregon Coast in Lincoln City STR permits will be more difficult to come by.

22 February 2025 | 6 replies
My name is Shai, and I’m currently involved in land flipping across different states in the U.S.

4 February 2025 | 87 replies
To be direct, I am not a fan of what you are proposing because it shifts all the risk onto the other partner.

10 February 2025 | 29 replies
A realtor who used to have a PM company called "JBS Realty" until this month.He used to manage 8 of my properties and is currently refusing to pay out multiple 5-figures worth of rents/property reserves/security deposits/unpaid utility bills owed.

3 February 2025 | 5 replies
From the website and information packet I read through it seems like a good way to dip a toe into farmland investing but haven't really been able to find any independent reviews or feedback that isn't posted directly on their website.

12 February 2025 | 27 replies
Quote from @Drew Sygit:My apologies w/my earlier post (below), I was on my phone and not laptop so it wasn't tagging.I will if I may add some additional thoughts...1) The appraisals I've seen in these markets are no where near Zillow estimates.

20 January 2025 | 5 replies
Please see the rough numbers below :Tear down house price 350k,Construction cost 165 sqft * 2 build=627k Darnell, did you get your questions answered?