![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/222019/small_1621434265-avatar-kyleevans20.jpg?twic=v1/output=image&v=2)
29 July 2017 | 10 replies
But the big problem is it getting in the duct work.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/607855/small_1621493695-avatar-brycewong.jpg?twic=v1/output=image&v=2)
13 July 2017 | 7 replies
Then I'd add a dehumidifier in the area and maybe run an extra hit off of my ductwork around that area.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/482309/small_1621478642-avatar-stos.jpg?twic=v1/output=image&v=2)
15 July 2017 | 2 replies
That way I don't have to do all the duct work too.
1 September 2017 | 17 replies
When the furnace was installed they added about 3" of extra duct work which shrank the space for the water heater.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/69934/small_1621414312-avatar-marianlibrarian.jpg?twic=v1/output=image&v=2)
1 August 2017 | 7 replies
Can anyone recommend someone to install ductwork and cental heat and air in Amarillo, Texas?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/662268/small_1727991530-avatar-jimn17.jpg?twic=v1/output=image&v=2)
9 August 2017 | 2 replies
One unit also needs all new duct work (6 drop changes).
20 September 2017 | 5 replies
Unfortunately it turned out not really to be possible to sub-meter the gas, becauase there was not room to add 4 furnaces and separate ductwork for the units.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/175570/small_1694748249-avatar-controller10.jpg?twic=v1/output=image&v=2)
9 August 2017 | 9 replies
Because the Thermostat is turned so low, a lot of condensation is forming on the ductwork inbetween the first floor ceiling and the second floor floor.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/316337/small_1621443723-avatar-integer.jpg?twic=v1/output=image&v=2)
18 July 2017 | 1 reply
All of the duct work is much easier working on a flat slab rather than a rough dirt surface.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/439239/small_1714155019-avatar-jamesa38.jpg?twic=v1/output=image&v=2)
3 August 2017 | 12 replies
Demo Total Bath and kitchen Walls and ceilings Windows, doors and trim Floors where damaged Rent dumpsters Total labor 5580 Exterior Painting Pressure wash house Caulk where needed Paint house Total labor and estimated materials 4850 Foundation Reinforce existing footings Replace floor joists where needed and install new subfloors Install new floor joists in addition to level with existing house Total labor and estimated materials 8875 Plumbing Replace pipes throughout Run new pipes to accommodate new layout Replace main water line Total labor and materials 7500 Insulation Install insulation in attic Install insulation on walls Total labor and materials 4580 Electrical Update electrical throughout Total labor and materials 7850 HVAC Install a new HVAC system Install new duct work Total labor and materials 5890 Interior work Total Open up living room to dining room Create 3 bedrooms and 3 baths Install sheetrock on walls and ceilings Mud, sand and prime walls and ceilings Total labor and estimated materials 12785 Trim work Install baseboards throughout Install trim around windows and doors casing Install new interior doors Total labor and estimated materials 4850 Interior Painting Paint ceilings Paint walls Paint trim Total labor and estimated materials 3580 Wood Floors Repair wood floors Install new floors in addition Sand and stain floors throughout Total labor and materials 6750 Master Bath Build a concrete pam in shower Install hardy boards on walls and floor Install tile on floor and walls throughout Install sink cabinets, toilet, and faucets Install light fixtures and accessories, install glass shower door Total labor and estimated materials 7500 Guest bath Install tub Install hardy boards on walls and floor Install tile on floor and walls Install faucets, sink, and toilet Install light fixtures and accessories Total labor and estimated materials 5750 Guest bath Total Install tub Install hardy boards on walls and floor Install tile on floor and walls throughout Install faucets, sink, and toilet Install light fixtures and accessories Total labor and estimated materials 5750 Kitchen Install hardy boards on floor Install tile on floor Install cabinets Install sink and faucet Install door knobs Install granite and backsplash Total labor and estimated materials 7500 Roof Remove old shingles and repair plywood Install new shingles (25 year warranty).