Skip to content
×
PRO
Pro Members Get Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
$0
TODAY
$69.00/month when billed monthly.
$32.50/month when billed annually.
7 day free trial. Cancel anytime
Already a Pro Member? Sign in here

Join Over 3 Million Real Estate Investors

Create a free BiggerPockets account to comment, participate, and connect with over 3 million real estate investors.
Use your real name
By signing up, you indicate that you agree to the BiggerPockets Terms & Conditions.
The community here is like my own little personal real estate army that I can depend upon to help me through ANY problems I come across.
Local Real Estate Networking
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

Updated almost 16 years ago,

User Stats

34
Posts
0
Votes
Racquel Morgan
  • Real Estate Consultant
  • Santa Rosa Beach, FL
0
Votes |
34
Posts

New Airport Video & Update

Racquel Morgan
  • Real Estate Consultant
  • Santa Rosa Beach, FL
Posted

Thought you might enjoy this short little video of the progress on our new international airport.

Just click the link below to watch the video:

http://vimeo.com/2826899

This new project is very exciting indeed and an opportunity awaits those who wish to be involved the growth it should stimulate. According to a recent update, the airport is ahead of schedule as of this month. Read the article below to view more specific details about the progression.

If you are interested in finding out more info about real estate, commercial and residential, in the area surrounding the airport, please send us a note or give us a call. It would be our pleasure to assist you in learning more about the emerging opportunities.

Thanks for your time,
Have an amazing day!

Kindest Regards,
Christine DeAngelis or Racquel Morgan
[removed]

-------------------------------------------------------

Construction Update - 1/8/09

by NewPFN on January 13, 2009

Construction at the new Panama City-Bay County International Airport continues to run smoothly and is currently about 3 and a half months ahead of schedule. A summary of the contracts underway follows:

Contract 1: Heavy Civil and Airfield Lighting:

* 115 pieces of heavy equipment in operation at any one time with approximately 160 personnel on site.

* 46% of time utilized (360 of 780 days).

* 37% of the 15†concrete paving lanes have been placed on 8,500 linear feet of Runway 16-34.

* On Taxiway D, all lime rock base and the majority of the first 2†lift of P-401 base have been placed.

* 12,902 tons of asphalt base course is in place along the Main Access Road (MRA) and loop road. Curb and lime rock base installation within terminal parking lots now 100% complete. Asphalt base course is in place over 75% of main parking lot.

* 34,888 tons of asphalt base and 20,000 cubic yards of structural concrete have been placed on 8,400 linear feet of Runway 16-34.

* 6,780 tons of asphalt base has been placed on Taxiway D, and the main apron.

* Stormwater drainage pipe installation is now 99% complete.

* Storm sewer installation within the General Aviation Area is now underway.

* Over 5.4 million cubic yards of earth has been moved (98% of total).

* Mass grading within Pond C now 90% complete.

Contract 2: Terminal Building, ATCT and Support Buildings:

* Gulf Power has completed installation of temporary overhead power to the Terminal Building location and site office trailers.

* Installation of reinforcing steel continues along Area’s A and B of the Terminal Building.

* New design of the Air Traffic Control Tower auger cast piles was required due to the original design not meeting the required load test. The original design required 72 piles drilled to a depth of 52 feet. The new design, based on the actual field load tests will require 44 piles drilled to a depth of 70.33 feet and 28 piles drilled to a depth of 80.33 feet.

* Rough-in of electrical and plumbing for the Air Cargo Facility is completed.

* Installation of mat reinforcing steel and dowels for the Air Cargo Facility is completed.

* Installation of the drainage structures for the Airport Maintenance Facility continues.

Contract 3: Utility Contract:

* Contract has been executed and all necessary submittals, insurance and bonds have been received from the Contractor.

* Notice to Proceed is anticipated within the first week of January.