California Real Estate Q&A Discussion Forum
Market News & Data
General Info
Real Estate Strategies
![](http://bpimg.biggerpockets.com/assets/forums/sponsors/hospitable-deef083b895516ce26951b0ca48cf8f170861d742d4a4cb6cf5d19396b5eaac6.png)
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
![](http://bpimg.biggerpockets.com/assets/forums/sponsors/equity_trust-2bcce80d03411a9e99a3cbcf4201c034562e18a3fc6eecd3fd22ecd5350c3aa5.avif)
![](http://bpimg.biggerpockets.com/assets/forums/sponsors/equity_1031_exchange-96bbcda3f8ad2d724c0ac759709c7e295979badd52e428240d6eaad5c8eff385.avif)
Real Estate Classifieds
Reviews & Feedback
Updated about 1 year ago on . Most recent reply
![Emil Pinlac's profile image](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1757009/1621515289-avatar-emilp4.jpg?twic=v1/output=image/crop=200x200@0x0/cover=128x128&v=2)
Please Advise: ADU Cost Components Breakdown?
Would anyone be able to give a quick breakdown of the various costs associated with planning and building an ADU in either your backyard, or as a garage-conversion in California? I'm talking about modest-sized JADUs or ADUs in the 400-600 sq. ft. range.
I've been considering building or converting a garage into these units, for a long-term, buy & hold real estate strategy. But I just wasn't sure where to start, or how to properly save/consider the various costs associated with them.
Most Popular Reply
![Whitney Hill's profile image](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/543967/1627376403-avatar-whitneyhill.jpg?twic=v1/output=image/crop=687x687@129x89/cover=128x128&v=2)
As a good rule of thumb, figure on $275-325/sqft for all-in ADU project costs…so an 500 sqft 1BR standalone ADU would typically cost around $160K. You can think of costs in two phases… Pre-construction and Construction:
- Pre-construction costs: $10-15K
- -Design: if using a stock plan, the design work costs about $5K. If going with a full custom plan (e.g. you have a unique lot layout that will require a customized layout)… closer to $10K, including construction drawings, title 24 energy report & electrical layout, permit processing
- -Permits: $5K is typically what the total costs to the city will run for an ADU, even with the waived fees
- Construction costs: $250/sqft + $10K
- -Building costs: typically $250/sf to start, for vertical building only. This is higher than for single family homes, since the cost is spread out over a much smaller footprint (e.g. still a kitchen+bath, but only 1-2 BRs).
- -Site work: typically $10K is a good number to start with, which includes preparing the building pad, connecting utilities, plus a small amount of landscape and concrete work.
- Other costs (not typically required): Additional structural engineering, Civil engineering, Soils engineering
Also, the cost would be around $75K for a standard garage conversion project of about 400 sqft....$8-10K for plans/design/engineering, $3-5K permits/fees, rest construction costs.