General Real Estate Investing
Market News & Data
General Info
Real Estate Strategies

Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal



Real Estate Classifieds
Reviews & Feedback
Updated 2 months ago on .

π‘ 7-Day Series: The Fifty Steps to Rehabbing a House π‘ 3/7
Day 3: Building a Strong Foundation (Literally!)
Now that demo is done and the site is cleared, itβs time to make sure this house is rock solid. Today is all about framing, roofing, and exterior repairsβbasically, the backbone of your rehab. If these steps arenβt done right, everything else (paint, flooring, fixtures) wonβt matter.
πΉ Step 9 & 10: Engineering & Drainage
Not the most exciting part, but if your property needs engineering reports (like soil testing or drainage fixes), get it done now. Standing water or bad grading can lead to foundation issues laterβand thatβs the last thing you want after the house is finished.
πΉ Step 11 & 12: Plumbing & Framing
If your rehab involves major plumbing work under the house, nowβs the time to tackle it.
π§ Fix or reroute plumbing lines before new flooring goes in.
π οΈ Repair subfloors and framingβthis means reinforcing weak spots and replacing damaged wood.
πΉ Step 13-18: Exterior Structure (Roof, Siding, Windows, & Doors)
β
Fix or replace the roofβleaks = problems.
β
Replace or repair siding to keep moisture out.
β
Install new exterior doors & windowsβhuge for security & curb appeal.
β
Repair exterior trim & fasciaβsmall details make a big difference.
Pro Tip: If youβre working with a tight budget, focus on structural integrity first. A fresh coat of paint wonβt matter if the roof is caving in!
Once youβve locked in a solid structure, the fun stuff is right around the corner. Tomorrow, we tackle major systemsβHVAC, electrical, and plumbing!
π Come back for Day 4: The Heart of the House β HVAC, Electrical & Plumbing! π§β‘π¨