![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2259293/small_1637973722-avatar-charlesc387.jpg?twic=v1/output=image&v=2)
18 February 2022 | 20 replies
I enjoy the process, from concept development through design and construction.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1228907/small_1621510440-avatar-gordonf12.jpg?twic=v1/output=image&v=2)
6 December 2021 | 1 reply
needs small wood railing added to entrance steps to avoid fallssmall mold/mildew patch in bathroom ceiling above shower needs to be removed and repaired needs retrofit bathroom exhaust fan to avoid recurrence of mildew ^downstairs needs interior re-painted (average cost?)
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2122551/small_1632842654-avatar-jamesf502.jpg?twic=v1/output=image&v=2)
28 October 2022 | 7 replies
The colors and design come in all styles.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2024802/small_1734300885-avatar-abbyhosey.jpg?twic=v1/output=image&v=2)
26 November 2022 | 10 replies
If you’re investing in a fix-n-flip project, this may come in the form of project management: meeting with GCs to bid out the construction, cutting checks to vendors and working with designers, architects, running materials etc.Assuming you’re not “the money” side of the deal, you should look to provide value in some other capacity.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/213853/small_1621433708-avatar-copptim.jpg?twic=v1/output=image&v=2)
31 October 2022 | 13 replies
Your hvac contractor should be able to setup a controls package to allow the two systems to interact with one another.Be advised many heat pump thermostats are more expensive then usual thermostats because they’re specially designed for that piece of equipment and you cannot use something like a nest or an ecobee.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2345169/small_1695762062-avatar-subhoshperikala.jpg?twic=v1/output=image&v=2)
13 October 2022 | 11 replies
I am looking for help to find designers for the gameroom and my PM mentioned a quote from a designer that its 10-12K for a basic game room with pool table/archade with painting/epoxy flooring.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2562060/small_1665233560-avatar-brandij28.jpg?twic=v1/output=image&v=2)
27 October 2022 | 9 replies
For the areas of land that are above the flood level you can then petition FEMA for removal of that flood designation.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/2565797/small_1665636455-avatar-isaacb135.jpg?twic=v1/output=image&v=2)
26 October 2022 | 9 replies
Could I bring my designs directly to a contractor, or would I need to have my designs checked with an engineering firm or architect before construction begins?
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1955607/small_1621516982-avatar-stephaniep141.jpg?twic=v1/output=image&v=2)
27 October 2022 | 4 replies
George is right, QB is a very robust program but it aims to be a solution for most businesses where Stessa is designed for our industry.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/389192/small_1724366893-avatar-jdainflips.jpg?twic=v1/output=image&v=2)
26 October 2022 | 2 replies
Featuring updated electrical, new appliances, new interior/exterior paint, new millwork, & thoughtful finishes throughout.