
1 August 2024 | 71 replies
In most markets that's closer to "A" room paint with trip charges.

31 July 2024 | 13 replies
The main house is completed and as far as labor, I spent $40,000 on just labor and that includes everything from full gut demo to finishes.We are talking about a 4BD, 3BTH two story 2400 ft.² home with a bonus room.This was a full gut job, replaced…12 Windows (new construction)2 sliding doorsTook out all carpet throughout.Took out this ugly 2” thick tile from half of the downstairs portion.Removed popcorn throughout the entire houseTook one wall downA little framing workReplaced entry door 80” x 92”Drywall patchingSmooth drywall work50 recessed lightingAll electrical neededAll plumbing neededNew cement walkway instead of one walk to the front door I created two steps with two lights in each step.Install kitchen cabinets, excluding countertopInstall all three vanities3 bathtubs with one being a modern standalone tub in the masterAll tile work (bathroom wall & floor, kitchen backsplash)Installing of all hardware, faucets, showerheads, etcInstalled 8 single panel doors with hardwareAdding self-leveler after tearing out that thick tileNew LVP flooring throughout the entire house except bathrooms,all baseboards, trimsPainting the entire house, painting all the doors, painting the outside trim.Reframing the outside balconyReframing the fireplace to install new linear modern electrical fireplaceand they took care of the two trash bins.I mean, completely redone.The only thing that was not included in the $40,000 is landscaping, counter top cut and install and of course the ADU which I’m currently working on now.So my question for my fellow investors and contractors did I pay too much?

31 July 2024 | 11 replies
I'm not trying to rip into the work and expense you've done, but for not much more per night, I can get something really great with more bedrooms across the street in Championsgate, Windsor or Solara.I'll jump in about the grill too, that's way too much, especially since your title says "Pool & BBQ", but I have to spend extra to get the BBQ part.

30 July 2024 | 8 replies
If he does move out and has been there for 24 years, my guess is you are going to have quite a few expenses (ie new flooring throughout, paint and possibly updates-countertops, etc) just from normal wear and tear.

1 August 2024 | 12 replies
A typical turnover can be a month or 2 of vacancy and $2-10k in make-ready costs (cleaning, paint, flooring, appliances, towel racks, vanities, etc. that gets beat up and broken norma wear and tear).

29 July 2024 | 7 replies
I take it that it's safer to just assume that any letter from or call from a random number is most likely some kind of rip off?

30 July 2024 | 0 replies
Power stripped 60 years of paint from the floor-to-ceiling river rock fire place.

29 July 2024 | 3 replies
He's adamant it be done before any cleaning or painting.