![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1972298/small_1621517189-avatar-lindseyc83.jpg?twic=v1/output=image&v=2)
10 May 2021 | 71 replies
Consider how diverse they are, environmental impacts etc, and other fashionable categories, then the financial engineers can print the money and give it to the companies they like.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1994144/small_1638742086-avatar-yukaf.jpg?twic=v1/output=image&v=2)
3 May 2021 | 10 replies
The inspector recommended I get a licensed HVAC engineer to check it.Other things are ---Open mortar joists/loose spalled brick at the chimney, loose shingles on dormer---Several windows painted shut sash cords missing, non-operable, rear deadbolt "keyed only" should have thumb turn for emergency egressloose/ flaking paint, possible lead-based paint---Cracked concrete at entry porch,--missing guard rail at rear steps,--several downspouts missing splash blocks/draining too close to the house---Grading is flat to sloping toward foundation additional top soil/grade modification may be needed---Suggested GFCI protected outlets at all wet locations as a safety improvement---Discoloration on floor joists in the basement, have evaluated for cleaning, possible treatment---Garage needs to be repaired completely.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1647817/small_1664464788-avatar-cristianv12.jpg?twic=v1/output=image&v=2)
30 April 2021 | 1 reply
I have been investing my attention to the resources of real estate investing since summer 2019 when I graduated from Dartmouth College with a bachelors in electrical engineering.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1599990/small_1621514049-avatar-nicod8.jpg?twic=v1/output=image&v=2)
4 May 2021 | 8 replies
Make sure your DD process includes, at a minimum:-A full property walkthrough, including every unit-Property condition assessment (PCA)-Environmental site assessment (ESA)-Roofing/Engineering/Pest/Mold inspections as needed-A Detailed scope of work based on the findings Happy to connect with you 1-1 if that would help
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1889779/small_1621516452-avatar-aebates1.jpg?twic=v1/output=image&v=2)
6 May 2021 | 1 reply
Social engineering is worth something too.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1859759/small_1621516185-avatar-davidm1697.jpg?twic=v1/output=image&v=2)
16 May 2021 | 5 replies
Then, you have three more floors at $120K a pop or so (holding costs $3400/month, 8 to 10 months construction, engineering, architect, interior designer costs, new water service/sewer at $30K) That is if you delegate everything.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1100208/small_1621508874-avatar-danielam4.jpg?twic=v1/output=image&v=2)
1 May 2021 | 2 replies
My company is looking to hire a structural engineer for current and ongoing renovations + development projects.Please be local to the Greater Phoenix area.Feel free to contact me for more details.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1923900/small_1621516727-avatar-sabrero.jpg?twic=v1/output=image&v=2)
5 May 2021 | 2 replies
I talked with my county briefly, and they explained that since I'm on septic and want to add another bed/bath, I would have to get a perc test to see if I can add another septic when mine fails and have a engineer draw up those plans.
![](https://bpimg.biggerpockets.com/no_overlay/uploads/social_user/user_avatar/1406398/small_1621511996-avatar-lovorn.jpg?twic=v1/output=image&v=2)
4 May 2021 | 1 reply
What does county planning say about the time frame to start and what engineered plans are filed?