
2 June 2021 | 4 replies
Leave by X date for X money with the home in broom clean condition.

3 June 2021 | 9 replies
Since the reassessments and attendant liens occurred after the Date of Policy, the claims were denied.

1 June 2021 | 0 replies
This is the outline for the contract that was signed:I, "SELLER", of BLANK Financial (the seller) am the owner of the property located in Pend Oreille County (assessors parcel number: BLANK).Said property is being sold via contract (the contract) to BLANK (the borrower) with a closing date that has yet to be determined.

4 June 2021 | 35 replies
The buyer reviewed property disclosure and thought he saw a date with this year on it of leases ending and signed it.

2 June 2021 | 0 replies
To date, I have created two strategic partnerships with other veteran organizations to match veterans with parking industry jobs of varying skill levels

2 June 2021 | 2 replies
After the expiration date of the loan term, I tried contacting the investor to arrange for the return of my funds, plus interest but did not get a reply.
2 June 2021 | 4 replies
@JD MartinI have a service agreement with a company, the service effective date was today but the HVAC broke last week.

4 June 2021 | 4 replies
My development project has had the substantial completion date pushed back by 2 months because subs arent showing up.

3 June 2021 | 3 replies
A nonconforming use is a use of land, buildings, or structures that was lawfully established prior to the effective date of this ordinance, or any amendment thereto, but which does not conform to the regulations for the zoning classification in which it is located.Nonconforming uses may be continued subject to the following limitations:a) No nonconforming use shall be extended, expanded, enlarged, or moved to occupy a different or greater area of land, buildings or structures than was occupied by such use at the time it became nonconforming; provided, however, a nonconforming use may be extended throughout any parts of a building which were specifically designed and arranged for such use at the time it became nonconforming.b) No building or structure devoted to a nonconforming use shall be enlarged, extended, reconstructed, moved, or structurally altered unless such building or structure is thereafter devoted to a conforming use; provided, however, such building or structure may be enlarged or extended upon prior authorization from the Board of Adjustment, which authorization shall not be granted unless the Board of Adjustment makes each of the following findings of fact:1) The proposed enlargement or extension shall be de minimis in relation to the existing building or structure.2) The proposed enlargement or extension shall not increase the intensity of the nonconforming use, which is to say, it will not result in an increase in dwelling units for a residential use nor in gross floor area for a nonresidential use.3) The proposed enlargement or extension is designed so that it will not render the use of the property any less compatible than it is in its existing circumstances.4) The authorization of such proposed enlargement or extension is not otherwise contrary to the public health, safety or welfare.c) A nonconforming use of a structure may not be changed to another nonconforming use unless such change is authorized by the Board of Adjustment.