
15 July 2012 | 21 replies
I couldn't walk in the front door and speak to someone if there are questions/issues.

25 October 2011 | 14 replies
New kitchen, S/S appliances, 1 car attached garage, no sunroom, only 1,500 sq ft.

27 November 2011 | 4 replies
It depends on state law and at what stage to foreclosure process is in.In Texas, if they have posted the notice on the door of pending foreclosure and Sheriff's auction, then the bank cannot deal with you at all.

1 November 2011 | 12 replies
I am trying to figure on costs of rehab as well as what to offer on home - ( I would reside in Home there after as owner occupant ) it needs the following from what i can see.. x2 for two floors/ apts- 43 replacement windows- 43 Square of Roof- a Rather Large Tree Limbs Hanging over roof cut- 4 Exterior Doors with storm doors- 6 Exterior doors with no storm doors- Raise Porch Rails to code ( another ft or so ) Porch in front is 50 ft & rear Porches 30 ft- Fix Front wooden stairs @ 5-6 ft wide- Fix Water entering basement thru Bull Ked ( add a drain or pour concrete )- Pour Concrete in Three car garage floor ( is dirt now )- Needs Heating & Hot water, and baseboard heat up two floors ( two new furnaces and FHW baseboard brought up two stories )- Electrical service upgrade from 60 amps old knob and tub to breakers and also bring up two floors adding new elec service in whole building adding plugs in all rooms plus washer and dryer hookups - 2 Panels, and move it to outside from basement..- New sub floors in Kitchens where needed , and then Linoleum floors in kitchen- Total Cleanout 3-4 Roll Off Dumpsters for left behind junk- Linoleum in pantry 4x8- 2 Bathrooms - Needs new linoleum and 1 needs Sub floor- Bathroom walls - rip off old plastic tile in one and make drywall and paint - Ba 2 Needs Rip off wall paper and skim and paint2 - Living room Kitchen & (2) Dining Room and 3 (6)Bed rooms Refinish Hardwood floors on ea floor so x22- Living rooms, kitchen and dining rooms, remove wall paper and skim coat, and paint all walls and ceilings2 - Living Rooms and windows remove all trim and replace with new and paint ( lead Paint )2 - Repair Bathroom Ceilings and Pantry Ceilings and then paint6 Bedrooms Fix Drywall, paint walls and ceilings2 Bathrooms install bathtub wall panels2 - Install Kitchen Cabinets , and countertops, and Sink in both pantrys2- Install Dishwashers including pipe, drains and elec in two pantries2 - Over stove - More cabinets in Kitchen @ 6 ft top and bottom with countertops2 Install washer and dryer hookups after bringing power to locationApprox 150-200 ft of Asbestos removal in basementalso what is the lead time to do all this..?

10 November 2011 | 31 replies
Did you find that easy to do or is it more the result of prolonged efforts and successes?

28 October 2011 | 2 replies
The movement never stops and it's a never ending sheet rock repair and door and window shimming story.

25 November 2011 | 27 replies
There are plenty of auto mechanics who operate their garages under an LLC or corporation.

9 November 2011 | 8 replies
At this time I am giving them rough ARVs, estimates on repairs, opening doors, scheduling appointments, and negotiating deals on their behalf.

1 November 2011 | 2 replies
She puts a lockbox on the door and the tenant rep shows the unit without my broker being there.

4 November 2011 | 16 replies
Once fixed up and remodeled, it will be a 3bed/2bath 1712 sq ft.Major improvements include; replaceing interior doors and two entry doors, flooring thoughout house (carpet/tile), ceiling light/fan fixtures,basement(all), new electrical panel,countertops, windows, and paint.