
18 October 2024 | 12 replies
@Art Marquez for your architecture needs!

15 October 2024 | 2 replies
I’ve paid for permit applications, clearing trees, survey, design and engineering, and architectural plans.

6 October 2024 | 0 replies
Assets identified in this study include:Permanent Fixtures: windows, doors, bathroom fixturesStructural Components: Roof construction, drywall, wood framingBuilding systems: water heater, electrical distribution, HVAC, plumbingInterior Construction: Wood flooring, stairs, ceramic tileThis engineering-based cost segregation study included the following methodology:Physical Inspection through a site visitDocumentation review including architectural plans, accounting records and construction documentsA cost analysis which utilizes engineering principles in order to allocate costs to their applicable asset classificationsCalculation of the depreciation schedule using MACRSAs a reminder, bonus depreciation started to phase out in 2023.

12 October 2024 | 54 replies
- My area of expertise is within the field of architecture and construction.

7 October 2024 | 7 replies
An activity is a personal service activity if it involves the performance of personal services in the fields of health (including veterinary services), law, engineering, architecture, accounting, actuarial science, performing arts, consulting, or any other trade or business in which capital isn’t a material income-producing factor.7.

1 October 2024 | 29 replies
For example, I’m doing three side by side duplexes and it’s costing me $135 psf, but I had to spend an extra $10k per foundation because of bad soil, and the smaller the property the higher the cost psfI’m working on a 28 unit with elevator, demo required, green roof, and it’ll cost me around the same psf as the duplexes.I’m doing three side by side triplexes which are full renovations, basement digout, all new facades, and that’s costing me about $106 psf for construction Non of these numbers include architecture, geotech, MEPS, environmental, utility plan, or finance costs

26 September 2024 | 10 replies
Another option is to take the drawings to an structural engineer and have him or her to sign the engineering drawing not the architecture.

24 September 2024 | 0 replies
Assets identified in this study include:Building systems: water heater, electrical distribution, HVAC, plumbinPermanent Fixtures: windows, doors, bathroom fixturesStructural Components: Roof construction, drywall, wood framingInterior Construction: Wood flooring, stairs, ceramic tileThis engineering-based cost segregation study included the following methodology:Physical Inspection through a site visitDocumentation review including architectural plans, accounting records and construction documentsA cost analysis which utilizes engineering principles in order to allocate costs to their applicable asset classificationsCalculation of the depreciation schedule using MACRSAs a reminder, bonus depreciation started to phase out in 2023.

23 September 2024 | 5 replies
What you may save in material you will make up for in engineering and architecture fees.

20 September 2024 | 3 replies
How much cash have you already injected into the deal including soft costs like architectural fees, permitting, etc...that you can document.