
1 February 2021 | 10 replies
Operating Agreement, laying out all the "what-if."

3 February 2021 | 48 replies
Estimate to rebuild bowed wall, install interior drain tiles and sump pump, is $20k.

31 January 2021 | 0 replies
Tiled guest bath.

31 January 2021 | 1 reply
Working on a flip and now it’s time to install subway tiles in the kitchen.

3 February 2021 | 11 replies
What is the best way to lay out my case and receive as much in damages as possible?

2 February 2021 | 1 reply
They had several design meetings, usually after work, half an hour or so of reviewing tile samples and pictures of light fixtures and pillows - followed by 3 hours of drinking a bottel of wine and talking about mutual friends and how to safe the world.

9 February 2022 | 6 replies
Done - Helped my friend with a full bathroom remodel and tile backsplash for my sister.4.

2 February 2021 | 2 replies
At this point since I don’t know what I don’t know, I’m just looking to get a lay of the land as I don’t know much about the area, and any insights would be greatly appreciated.

9 March 2021 | 11 replies
@Jerel Ehlert thanks for laying out the potential scenarios.

2 February 2021 | 0 replies
Top to bottom cosmetic renovation on the inside, including removing a wall between dining/kitchen, refacing and re-arranging existing oak cabinets, new farm sink and custom base cabinet, new tile backsplash, custom island, quartz counters, and extending new hardwood floors into kitchen.