Skip to content
×
Try PRO Free Today!
BiggerPockets Pro offers you a comprehensive suite of tools and resources
Market and Deal Finder Tools
Deal Analysis Calculators
Property Management Software
Exclusive discounts to Home Depot, RentRedi, and more
$0
7 days free
$828/yr or $69/mo when billed monthly.
$390/yr or $32.5/mo when billed annually.
7 days free. Cancel anytime.
Already a Pro Member? Sign in here
Pick markets, find deals, analyze and manage properties. Try BiggerPockets PRO.
x
Results (10,000+)
Mark Simpson Interesting use case for ChatGPT Operator:
29 January 2025 | 6 replies
What you were able to do- makes a good case for not disclosing all the amenities one provides- publicly.
Justin Pumpr Experiened, but struggling REI - Advice needed
10 February 2025 | 11 replies
Based on the information you've provided it seems like you might be targeting the wrong type of deal flow for your budget/risk-tolerance/area.
Fetch Phoenix Bought in a Fire Prone Area, should we sell and consider renting?
1 February 2025 | 7 replies
Regarding fire prevention, luckily, we're members of the local community organization that provides a Firewise assessment to members.
Clarase Mika Did You Know You Can Purchase Property in Germany With Only 5-10% Down? Here’s How
24 January 2025 | 0 replies
Show Financial Stability- Proof of Income: Military pay provides a stable and reliable income source that banks value.- Creditworthiness: German banks assess your financial standing, so keeping accounts in good standing is critical.4.
Braeden Warg What to pull permits on
27 January 2025 | 8 replies
They will take the permit fee and send an inspector that will provide some assurance that the work was performed correctly.
Alan Asriants This is exactly how much it cost me to rehab a 2bed 1 bath apartment in Philly
27 February 2025 | 24 replies
. Haul away any demo/trash – Owner pays for cost of trash – contractor to provide all the receipts Pick up any/all materials for project and deliver to jobsiteKitchen Install new cabinets. Remove soffit and half wall, reposition outlets and switches. Extend half wall to match hall. Install bar island (12 inches) on half wall. Install two pendant lights above the half wall. Install new tile on kitchen floor, including floor cement board and tile. Install new appliances (refrigerator, range, microwave, dishwasher, and garbagedisposal). Run dedicated electrical lines to the refrigerator, range, microwave, dishwasher, and garbage disposal. Install faucet and cabinet hardware. Install all necessary plumbing Install backsplash. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000
Steven Rosenfeld What do you think of syndicate sponsor Goodegg Investments?
26 January 2025 | 51 replies
Has anybody invested with them who can provide some valuable feedback?
Cameron K. Seeking Feedback: Market Rent Research Platform
27 January 2025 | 1 reply
•For example, a listing with three price drops and 180 days on the market would be weighted less than one with 30 contacts, no price drops, and a quick removal after 30 days.3.Open Data:•Provide direct access to each comp’s details: price history, leasing schedules, photos, and even links to the original listing sites—all without leaving the platform.These three issues have been my biggest frustrations with current tools, and I’m building this out for internal use in my market.My questions to you:•Is this something you would want to see in your market?
Damon Diddit Inheriting a problem tenant after closing
31 January 2025 | 8 replies
When I have inherited tenants, I have been most successful when I have provided longer non-renewal notices, like 60-90 days, and offered to assist with moving costs.
Vaughan Moody Is this reasonable?
30 January 2025 | 5 replies
(So therefore we wouldn’t have to pass on the cost of the repair to him ie. the tenant).Now, several months later, I contacted the contractor to ask if he would be to provide a price estimate for a different job at our house.