
2 April 2013 | 9 replies
Second floor is rented to tenants and first floor has kitchen, a bathroom, giant living room and dinning room.How do we go about picking the % of the building to depreciate?

17 April 2013 | 4 replies
I will be replacing gutters, shutters, front door and garage door, stainless steel appliances, cabinets, vanities, countertops, inside doors, back door, new grass and landscaping, new fence, new tile in bathrooms,acasia hardwood in kitchen, foyer and master bedroom, all plumbing fixtures, all missing copper pipe with cpvc, door hinges and handles, toilets, adding double trey ceiling in master, granite counters, painting inside and out, new carpet, adding some crown molding in master, kitchen, foyer, family room and master bath.

30 June 2013 | 8 replies
I believe after repairs this home will sell for much more)The renovations would include: an extended and upgraded kitchen, combine 2 of the rooms to make one big master suite with walk in closet and and a master bathroom suite, adding a bathroom, uncovering and refinishing all of the original hardwood floors throughout the entire home, add on back screened in porch with an additional open deck off to the side, new fencing and landscaping, a new roof and some modernized upgrading to the additional rooms.

20 November 2013 | 41 replies
Right down a cavity where the vent from the kitchen comes up through the walls.

25 June 2023 | 15 replies
I could tell from the questions appriser asked me during re appraisal: any remodeling project especially kitchen, bathroom, big updates as roof, windows, exterior and interior painting.

11 January 2017 | 8 replies
Basically, everything is done except for refinishing the hardwood floors, installing light fixtures, bathroom accessories (mirrors, towel bars, etc) and we are still waiting on the quartz counter tops for the kitchens and bathrooms to be delivered.

3 August 2015 | 14 replies
I am meeting with my contractor Sunday to go over repairs and get an estimated timeline.This thing needs: New roof, flooring, kitchen gut job, electrical upgrade (currently 100amp, ungrounded), and relocate laundry to basement (currently in a makeshift room built inside the carport), among other minor repairs.

19 October 2015 | 3 replies
We are closing off the existing formal dining from the kitchen since it is too small for a modern dining room in our eyes.

25 July 2015 | 18 replies
We removed the seriously charred material, and because smoke is greasy, I hired a fire damage cleaning company, that has lime green trucks, to come in and scrub down the plaster walls, ceilings, and floors, Of course any and all fibrous material such as carpets , and cork boards in the kitchen and kids rooms had been removed and disposed of .