
28 June 2020 | 6 replies
insulation in ceiling & on walls, heat/A/C unit, electrical & lighting, perhaps need to upgrade the electrical panel in there, replace garage door with something else, new interior walls, drywall, bathroom fixtures, some kitchen appliances, and finishes (paint, tile, etc).2. we have all types of Contractors here, from high end to fly-by-night.

27 June 2020 | 4 replies
Flat, even floor - floating luxury vinyl planksUneven floor that cannot easily be corrected - adhesive vinyl planks.

29 June 2020 | 8 replies
I know the tax pros here bill based on hourly fees, levels of like packaged service, flat rate fees.

28 June 2020 | 26 replies
I'd say there isn't a hard rule on lease renewals - some PM's don't charge, some charge a flat rate, and some even on a % of monthly rent basis based on the renewal documents / resources involved.

28 June 2020 | 1 reply
Utilized BKCO Title & Escrow work at a flat fee of $800 and provide exceptional service.

23 June 2020 | 5 replies
The building is a 2 flat and the current tenants are myself and my brother.

23 June 2020 | 5 replies
2 Flat Zoned RT-4 Chicago IL

13 July 2020 | 3 replies
All light fixtures were updated, some electrical repairs were made and upgraded the electric panel to 200 amps.

27 June 2020 | 5 replies
Safe off exposed electrical wires next to panel.

1 September 2021 | 5 replies
There are two flights of stairs inside, all floors are relatively flat, will be exposed to a lot of direct sun in areas.