Joe Szymczyk
Up to 10 properties banks finance after that?
8 March 2020 | 22 replies
Do a 1031 exchange of your cheapest 2-3 properties for one more expensive property to open up a couple slots.
Sami Gren
Diy extermination tips
3 March 2020 | 3 replies
Also, if you have open spaces like open piping in the floor by a radiator or something like that, get some steel wool and fill the hole.
Erich Henson
Perfect BRRRR this time!
4 March 2020 | 1 reply
Painted exterior and interior, new flooring, new kitchen countertops, stainless steel appliances, new bathtub and surround, new light fixtures, and repairs as needed.What was the outcome?
Logan Merrick
Would you offer on a house that has foundation issues?
9 March 2020 | 60 replies
After repairs here you're often left with a basement wall held up with steel beams that most buyers shy away from.
Nancy Y.
Help with estimating repair cost
5 March 2020 | 5 replies
Those water pipes are practically non repairable and will need to be replaced largely in areas where they are danger since they are threaded corroded steel pipe.
Kevin Hart
2nd Flip Complete in Louisville
16 March 2020 | 1 reply
we did some cosmetic updates in the kitchen, new stainless steel appliances, fresh paint and flooring throughout.
Kyle D Birch
Chicago Lender recommendations cash out/refi
5 March 2020 | 8 replies
Last July, my fiancé, now wife bought a 2 flat that was advertised as a SFH and the zoning certificate says SFH, but it was built as a two flat. 4 entrances, 2 baths, 2 kitchens, 2 furnaces two 1960’s mailbox slots in the brick etc.
Jacob Cannon
Lustron prefabricated enameled steel houses
12 April 2021 | 1 reply
Hi All,Curious if anyone out there has bought a Lustron style prefabricated enameled steel house before?
Austin Guess
Real Estate Newbie in Portage, Indiana
11 March 2020 | 1 reply
I’m a full time manager at the steel mill in Burns Harbor and am looking to start investing on the side by flipping & selling single family homes or by becoming a landlord of single family homes around NW Indiana.
William M.
My first and last FHA Live-in-Flip
13 March 2020 | 0 replies
Rehabbed the kitchen: tore out all upper cabinets, cleaned up some mold, repainted the walls/scraped the popcorn ceiling, put in faux shiplap (8in plywood strips), hung up open shelves, installed new light fixtures, painted inside and outside of under the counter cabinets (dark Blue), replaced drawers, added new stainless steel cabinet/drawer handles, tore down non-load bearing wall, replaced tiles, re-routed light switch, and painted window panes.