
10 April 2014 | 3 replies
You could just draw up a contract with the wholesaler.

11 April 2014 | 7 replies
Has anyone ever used google's drawing program to layout houses?
6 January 2016 | 6 replies
The local bank my mom uses gives her a renovation budget, usually in a few draws.

7 September 2018 | 6 replies
Repeatedly drawing down the water to the pump can cause a pump to fail prematurely, which has its own cost implications.Hope that helps.

12 April 2014 | 10 replies
Until a second, and third and fourth lendrer draw the same conclusion.

15 April 2014 | 26 replies
I'm back to the drawing board but I'm at peace with that decision and very grateful for their generosity.

14 April 2014 | 9 replies
All rehab funds should be escrowed or held by a 3rd party with draws being made upon progress.

16 April 2014 | 3 replies
Just use a different campaign.You need to be patient and talk to an awful lot of callers before drawing too many conclusions.

17 April 2014 | 5 replies
. $20-$25k (if I use my neighbor, prob. be able to do a 5% deal on all 3 houses)My friend/GC would be the primary GC and I would be assisting and learning as much as I can and trying to lighten his work load bec. of his lower cost.He has built several of these houses and already has the plans draw up and they have been selling for $400k and his new builds will be going for approximately $415k as the first few were sold to establish the street.Being conservative I estimate a profit of approximately $60k +or- per build.I originally was looking to borrow $250k per build to leave room for unexpected costs, and I was offering 15% of the borrowed amount upon completion of the project (not APR) and no monthly payments.

3 May 2014 | 26 replies
Thank you so much for all of your insight, I'm gonna go back to the drawing board for a bit and will reach out to you guys very soon.Thanks again!!