Brian Hughes
Snohomish county WA - Mixed use Office - conversion to residential?
19 May 2024 | 2 replies
Its not just a matter of rearranging dividing walls plumbing and electrical.
Shane Bunda
Permits and Fees for ADU garage conversion in LA, CA
18 May 2024 | 3 replies
If you're also adding plumbing, electrical, a bathroom and a kitchen then I'd say it's not enough.
Chris Purcell
Do you raise rent on good tenants?
21 May 2024 | 41 replies
The day I purchased the property I let everybody know via notice that I would be fixing any problems that they may have such as plumbing, electric, whatever.
Ike Hobbs
My First BRRR
18 May 2024 | 1 reply
Rehabbed most of the stuff myself except for supply lines in the plumbing.
Miguel Suarez
I'm Planning To Buy A House Out Of State early 2024 (any suggested states to invest?)
24 May 2024 | 259 replies
I will rebuild brick walls, replaced beams, plumbing, electrical, etc.
Josh Harris
Investing in Atlanta, GA and surrounding areas
19 May 2024 | 24 replies
Most of them haven’t been maintained properly (think worst case scenario like bottles in vents, grease in plumbing, uneven floors , crawl space issues).
Thomas Blocker
Anyone in Sacramento use a Owner-Build Permit for ADU?
16 May 2024 | 5 replies
After nearly a year of construction and about $40K in costs, all that had gotten done was the laying of the plumbing and foundation, the prior of which my contractor had to redo.
Wai-Ming Lau
Estimating repair and upgrade costs during building inspection
15 May 2024 | 3 replies
While shopping for a small multi-family building (3 or 4 units), I would like to get an inspection of the building to get an estimate of repair costs if any problems are found (foundation, roof, electrical, plumbing, heating).
Yakir Aloni
Help pls with first brrrr
15 May 2024 | 3 replies
Things that drive the ARV higher - roof, plumbing, electrical, paintThings that don't drive the ARV as much - windows, landscaping, driveway
Scott R.
Cost to build a duplex or 4plex in Bradenton, FL
16 May 2024 | 5 replies
The cost starts with 1.) plan cost (survey, civil engineer, site plan, architect, structural engineer, mechanical/electrical/plumbing (short for MEP) plans, etc.).