
15 December 2017 | 5 replies
Do they want to have 1 am leaking toilet calls?

18 December 2017 | 19 replies
New kitchen cabinets, granite counter tops, new stainless steel appliances, new fixtures throughout, new outlets and switches throughout, luxury vinyl plank flooring on first floor, carpeting on second floor, new vanities in all bathrooms, new toilets, 2” faux blinds throughout, new windows (more on that at the end), and a new water softener system.

15 December 2017 | 2 replies
The exterminator says that all the entryways are sealed, and the mice are entering either through open screen doors, and possibly through the sewers/toilets.

19 December 2017 | 12 replies
For instance, the toilets, vanities, light fixtures, flooring, tile, backsplash, etc.

21 August 2018 | 9 replies
I sent out a few emails to local credit unions in the area and will look into HML if that doesn't pan out.

19 December 2017 | 2 replies
We have the architect blue prints, however, we now have to design the interior in where things are going to go (cabinets, DW, sink, toilet, etc.)

13 June 2018 | 9 replies
If it's a rough crowd, most likely you will have plumbing issues if they are not trained properly on what can and cannot be put down the drains/toilets.
4 February 2018 | 23 replies
Regardless of what figures are shown any prospective buyer is going to run them their way and if the numbers pan out for them then great, if not no big deal.

22 February 2018 | 13 replies
The kitchen was remodeled, new appliances, granite, knocked out part of LR wall for open-concept kitchen/LR, tore up carpeting throughout to reveal hardwood floors, installed LVP in 1) kitchen and 2) den-turned 4th BR, upgraded toilets, painted entire house including pine planks and paneling, and crown molding, installed sliders to backyard.

8 February 2018 | 2 replies
Needs new toilets, pedestal sink and other odds and ends.