
18 September 2019 | 0 replies
And I see how a rehab can be a black hole.

18 September 2019 | 1 reply
Jut paint all the walls orange, trim it in black and sell it to a coven.

20 September 2019 | 2 replies
There are attorney's like Robert Black that is very good with many aspects of a deal.

22 September 2019 | 7 replies
I was thinking of going with matte black walls and gloss white doors/trim, but I'd love to see what others have had success with!

20 September 2019 | 1 reply
REHAB BUDGET and SCOPE OF WORK : $90K ( built into loan) $30K for each Gutted unit$5K per existing unit x6 = $30K TOTAL Spend was $100K $4500 for Foundation issues, landscaping, etc 2 gutted units: new electric- 200 amp upgrade Blown insulation for attic ( r38)new sub floorNew insulation throughout New sheet rock ( 5/8 fire wall for exterior living room walls, kitchen and in stair well) New 6 panel doors throughout with all new satin nickel hardware New 6 panel Steel Front and Rear Entry Doors New plumbingNew HVAC system( all electric got rid of gas) New ThermostatNew lights New Hot water heater New kitchen layout ( removed half wall to open up to living room, built alcove for fridge to increase floor plan) New white shaker cabinets with hardware, countertops , fridge, stove, range hoodNew LVP throughout New Carpet in bedroomsNew bathrooms ( vanity, tub, enamel over steel tubs, tiled surround, vent fans, vanity lights, faucets, low flow toilets, shower heads, and actuators) Added 1 new window in each kitchenOther units: ( completed in 409 B and 407 D ) other units will be rehabbed once tenants move out New LVP in LR, BR, Kitchen and hallwayNew Carpet in BedroomsNew six panel doors/ hardwareGlazed existing tub/tileNew shower hardware Low flow water options ( toilets, shower heads, actuators throughout) New water heaters ( 407 D) Replaced AC 409 A ( it was 28 years old) New Fridge 409ANew Fridge 407CNew Stove 407 A Painted stairwells ( versatile grey) had attractive/durable commercial grade carpet installed on stairsInstalled new lights in stair well and motion sensors in 409 Installed Motion Sensor Flood lights on all the cornersInstalled Video Cameras on problem areasHad Duke Energy replace old lights with brighter LED on two poles Installed keypad entrance for both exterior stairwell entrances Cleaned/ repaired other AC units Fixed any issues with plumbing as neededFixed any issues with existing water heaters Installed new black shutters on both building Implemented quarterly Pest Protection Installed raised landscaped beds for 407 ( parking lot facing) Installed new Numbers for both buildingsPainted all exterior doors black installed new hardwarePainted central mailbox black We are still actively repositioning this property and will have another two tenants moving out end of this month ( September) but the property has generated enough profit from the other units at the increased rental rate that the business will be paying for these upcoming turns.

20 September 2019 | 0 replies
REHAB BUDGET and SCOPE OF WORK : $90K ( built into loan) $30K for each Gutted unit$5K per existing unit x6 = $30K TOTAL Spend was $100K $4500 for Foundation issues, landscaping, etc 2 gutted units: new electric- 200 amp upgrade Blown insulation for attic ( r38)new sub floorNew insulation throughout New sheet rock ( 5/8 fire wall for exterior living room walls, kitchen and in stair well) New 6 panel doors throughout with all new satin nickel hardware New 6 panel Steel Front and Rear Entry Doors New plumbingNew HVAC system( all electric got rid of gas) New ThermostatNew lights New Hot water heater New kitchen layout ( removed half wall to open up to living room, built alcove for fridge to increase floor plan) New white shaker cabinets with hardware, countertops , fridge, stove, range hoodNew LVP throughout New Carpet in bedroomsNew bathrooms ( vanity, tub, enamel over steel tubs, tiled surround, vent fans, vanity lights, faucets, low flow toilets, shower heads, and actuators) Added 1 new window in each kitchenOther units: ( completed in 409 B and 407 D ) other units will be rehabbed once tenants move out New LVP in LR, BR, Kitchen and hallwayNew Carpet in BedroomsNew six panel doors/ hardwareGlazed existing tub/tileNew shower hardware Low flow water options ( toilets, shower heads, actuators throughout) New water heaters ( 407 D) Replaced AC 409 A ( it was 28 years old) New Fridge 409ANew Fridge 407CNew Stove 407 A Painted stairwells ( versatile grey) had attractive/durable commercial grade carpet installed on stairsInstalled new lights in stair well and motion sensors in 409 Installed Motion Sensor Flood lights on all the cornersInstalled Video Cameras on problem areasHad Duke Energy replace old lights with brighter LED on two poles Installed keypad entrance for both exterior stairwell entrances Cleaned/ repaired other AC units Fixed any issues with plumbing as neededFixed any issues with existing water heaters Installed new black shutters on both building Implemented quarterly Pest Protection Installed raised landscaped beds for 407 ( parking lot facing) Installed new Numbers for both buildingsPainted all exterior doors black installed new hardwarePainted central mailbox black We are still actively repositioning this property and will have another two tenants moving out end of this month ( September) but the property has generated enough profit from the other units at the increased rental rate that the business will be paying for these upcoming turns.

18 November 2019 | 19 replies
Example: A black, single mother applies for your apartment on Monday at 9am.

3 December 2019 | 133 replies
If it is black, it will show as a reply under the quote.

29 November 2019 | 12 replies
As I went into middle school we were able to connect with a father of a girl who was in my grade and Girl Scout Troop.