
7 August 2021 | 4 replies
First see if the sellers are okay with reworking financing.

13 January 2021 | 1 reply
What we'd like to avoid is drilling into the slab and dropping the hot water pipe under the floor, or re-working the plumbing and electric to change the kitchen layout to avoid anything on that wall.

19 June 2021 | 0 replies
I hope that through this I can build connections as well as gather insight as to how RE works without a screen in front of me.

30 July 2021 | 2 replies
I completely re-did both bathrooms, re-working layouts to be more functional. re-did floors, tamed lot, other minor cosmetic upgrades and repairs.

30 April 2019 | 5 replies
Needed new roof, plumbing (drain lines and water lines), full rewire, new heat pump, stucco repairs/paint, drywall repairs and retexturing throughout, windows, reworked floor plan, added bathroom, new patios, etc.

29 April 2021 | 25 replies
And list goes on.... but anything they touched framing wise we have reworked.

27 April 2021 | 4 replies
I re-worked the estimates to be less conservative and hopefully more realistic (and added a few items that I missed).

6 May 2021 | 3 replies
This resulted in some minor rework due to communications issues but the deliverable was completed in less than a week and I saved $2,300 over local artists lowest bid.

4 September 2022 | 10 replies
You are young and can do your 9-5 and then do your RE work.

2 February 2023 | 10 replies
If a multi-family is entirely owned by our Client Owner, we may, or may not, pay the vendor from the Owner account, but will call them out routinely.In any case, if their vendor proves to be slow, or non-responsive; or creates new issues with tenant due to poor people skills; or performs shoddy work which must be re-worked in less than a year; or does not communicate necessary info/pics to our office for our records, we will inform the Owner that we will no longer utilize that contractor.