
7 September 2010 | 28 replies
My brother's girlfriend has an electric sander at her mom's house, so that's available to me if the PITAness outweighs my not wanting to inconvenience her.I got all the stuff I need to prepare my kitchen to be painted- the scary washing stuff (if anyone would give me tips on how to rinse this stuff off my cabinets and paneling, that would be great as my store didn't have the non-rinse type), the spackle, the paint chipper things, painters tape, and spraypaint for the things that go around the electrical outlets, as well as a few other things that I don't remember at the moment (lol)..I'm taking the cabinet doors off, the electrical outlet and switch covers off, spraypainting the switch/electrical covers, chipping paint, washing, more chipping, sanding, then putting up the blue tape.

22 November 2015 | 31 replies
Tape some tinfoil onto the fixture to approximate the molding/reflector, and hang it up temporarily to see what you think.

20 April 2016 | 30 replies
iif the prime contracts boarding/taping at 40c a sq ft and can get a boarder at 25 sq ft he s pocketing 15 per square why not just cut out the middle man?
9 April 2008 | 28 replies
I will have the new electrical panel installed by a pro and I will have the drywall professional taped because it would take me a year and a day to do.

26 November 2012 | 15 replies
Also, another note about the duct taping.

27 September 2017 | 12 replies
Junk, junk, checked out 100s of library tapes under sun.

30 October 2018 | 8 replies
My biggest concern is the HVAC systems, the roof will likely need replaced within a few years, and the asphalt parking lot likely needing to be redone.

16 July 2018 | 14 replies
You'll have time after you figure out if its leaking, and you don't have to replace a slate roof with a slate roof -- you can shed the slate and use cheaper 30-year asphalt.

9 June 2017 | 12 replies
Plus we decide case by case what we feel like doing.What we do ourselves (in general) - We paint both interior and exterior, hang and tape drywall (but on the last big drywall job we hired a couple of guys to hang the ceiling pieces), we fabricate and install trim, hang interior doors, install some flooring.