Don M.
First time with new construction: Cape Coral, FL
20 January 2025 | 204 replies
Quote from @Don Miller: Tile installed better late than never !!!
Jimmy Jeter
New construction, 75% done. About to run out of money
28 January 2025 | 11 replies
Still need cabinets vanities counters installed, floors done, drywall hung and finished.
Shannon Hartzell
I need a creative loan for an investment property
27 January 2025 | 5 replies
I am looking at 1 acre of land with a well and a septic already installed.
Unal Baris Kancoglu
HVAC is red-tagged. Need to replace it as quickly as possible.
15 January 2025 | 11 replies
We typically pay somewhere in the range of $3500 for a new, basic furnance, including install, if there are no other modifications to the system required.
Nelson Badillo
Water Meter Issues!
27 January 2025 | 0 replies
Can anyone recommend a reliable plumber or handyman who could install it for me?
Jason Edwards
First Flip Insights: 1272 Lakins Rd, Etna
20 January 2025 | 0 replies
To add value to the property, we undertook extensive renovations including the removal of over 40 yards of trash, installation of a new septic system and wall-hung boiler, and a new well pump.
Travis Hill
WHERE/HOW DETERMINES PROPERTY CLASS (A, B, C)?
23 January 2025 | 21 replies
In some older neighborhoods especially historic districts, the tenants look for older houses - they preferred the art deco bathroom tiles, the thick plaster & lath walls over granite countertops and stainless steel appliances.but class D neighborhoods are easiest to tell.
Ethan Gallant
Beginner looking to BRRRR in Canada
24 January 2025 | 5 replies
I spend roughly $120k on my renovations, but this is for the entire property and developing the secondary suite which certainly costs more (2 new furnaces, all new plumbing, new kitchens and bathrooms with tiled floors and showers).All said and done, I personally love it.
Jason Edwards
First Flip Insights: 1272 Lakins Rd, Etna
20 January 2025 | 1 reply
To add value to the property, we undertook extensive renovations including the removal of over 40 yards of trash, installation of a new septic system and wall-hung boiler, and a new well pump.
Rou Odab
Opinion Needed ASAP
24 January 2025 | 7 replies
ACM (Asbestos Containing Material) abatement is a tough one because often you won't know (outside pipe insulation & 8x8 tiles which I can spot and point out with no testing).