
19 February 2025 | 6 replies
Last week we sent an addendum to extend the mortgage contingency because it's been difficult to schedule the appraisal due to the very slow agent and scheduling around the current tenants.

7 March 2025 | 22 replies
Does the higher occupancy cause more cleaner scheduling headaches?

8 March 2025 | 8 replies
I am trying to simplify and automate as much of the bookkeeping process as possible.The core features:- Bank linking using Plaid (less reported disconnection issues than Stessa's integration)- AI transaction categorization- Automated mortgage breakdown into principal, interest, escrow- Profit and Loss, Cashflow and Schedule E reporting by property- Recurring transaction tracking dashboard- Receipt uploadingPlanned Features:- Balance Sheet- Receipt scanning- Cashflow projection- Collaborators- Turbotax exporting

6 March 2025 | 2 replies
Assets identified in this study include:Standard windows and doorsInterior ceilings and wallsBasic plumbing and electrical systemsBuilding structural elements and roofingBasic HVAC componentsWater heatersFire protectionThis engineering-based cost segregation study included the following methodology:Physical Inspection through a site visitDocumentation review including architectural plans, accounting records and construction documentsA cost analysis which utilizes engineering principles in order to allocate costs to their applicable asset classificationsCalculation of the depreciation schedule using MACRSAs a reminder, bonus depreciation started to phase out in 2023.

25 February 2025 | 12 replies
Begin a maintenance schedule ASAP.

4 March 2025 | 1 reply
We will also be jackhammering the floor inside the closet on the right apartment next to the bathroom to reattach the upstairs drain line. will install new schedule 40 pvc and reconnect the upstairs drain lines into the new truck line.

3 March 2025 | 2 replies
Referees schedule these, so the list updates daily and it’s free—no subscription nonsense.

5 March 2025 | 3 replies
There will always be changes in their schedule, manpower, timelines etc.

20 February 2025 | 3 replies
.💡 Tips for working with contractors and keeping projects on schedule?

6 March 2025 | 3 replies
They take 10% for all managed construction, so this is not a favor to ask for on a project that was behind schedule several weeks.