7 November 2021 | 3 replies
You may not be able to avoid the exclusions but knowing what the impact may allow you to shift the risk (using licensed and insured subs, specialists in environmental remediation, etc)

11 November 2021 | 4 replies
Is a phase1 environmental report and survey being provided?

15 November 2021 | 5 replies
Next thing you know you’ll be tryin to poop in the woods without an environmental study. :-)

1 January 2022 | 5 replies
They’re more expensive and slower but you can advertise it as more environmentally friendly (genuinely).

27 January 2022 | 5 replies
(my background: been doing wetland delineations and permitting in the gulf coast states for 10 years)I'd recommend you contact a local environmental consultant on that one.

15 January 2022 | 10 replies
May answer as to what you need to know before you make an offer is basically "everything" with the exception of less than obvious defects to the structure or situations that need environmental testing.

17 May 2021 | 7 replies
Pretty much every Phase I or II environmental site assessment I've ever seen references past studies, and not just studies done by the same company.

17 May 2021 | 3 replies
Some cost that may vary based on location will be your environmental impact study, your list of cost from the Architect may see a lower cost for the schematics on a smaller project, with similar footprints for all four units, versus varying unit size, and scope requirements (less work, lower cost for A&E), the feasibility study, proforma, 3-D renderings, and other associated cost are going to depend on where this project is going to be built.

6 June 2021 | 6 replies
In most places for almost anything permanent that isn't ag (storage barn, planting, etc), you will likely need to either engineer to meet floodplain requirements/permitting or find somewhere else.Happy to take a look at it if you DM me the location, my W2 is environmental consulting and I've done floodplain development permitting for about 7 years, mostly in TX and the gulf states.

25 May 2021 | 5 replies
The best you would be able to get is a Letter of Environmental Protection, which tells everyone you did illegal work then hired a licensed deleader in to fix it.