Chris Garnes
Please help - advice needed to complete two flip properties.
2 January 2025 | 2 replies
Estimated cost for remaining changes (all new electric, drywall, tile, fixtures, cabinets, roof, doors, windows, heat pump, some siding, and fencing.
Ilir Livadhi
New to the U.S., Experienced Renovator Looking to Start House Flipping
15 January 2025 | 10 replies
I’ve handled almost every aspect of renovations myself—plumbing, tiling, painting, drywall, and general construction.
Henry Clark
Belize Teak Plantation
4 January 2025 | 67 replies
This will end up smooth since we won't put tile on it.
Chris Garnes
Please help - advice needed to complete two flip properties.
10 January 2025 | 5 replies
Estimated cost for remaining changes (all new electric, drywall, tile, fixtures, cabinets, roof, doors, windows, heat pump, some siding, and fencing.
Ed Lopez
Excessive "Make Ready" Costs from Property Manager
21 January 2025 | 35 replies
This is a small 3 br house.Work Order Instructions:- Entry 1 : Security/Screen Door | Replace Exterior Door Screen- Entry 1 : Wall/Ceiling | Spackle and paint- Bathroom 1 : Door Stop | Replace door stop- Bathroom 1 : Light Fixture | Replace bulb- Bathroom 1 : Shower/Tub Caulking | Re-silicone tub- Bathroom 1 : Toilet bowl/lid/seat | Replace toilet seat- Bathroom 1 : Toilet Paper Holder | Replace toilet paper holder- Bathroom 1 : Tub/Shower | Relay loose shower tiles- Bedroom 1: closest to the front door : Closet/Door/Track/Shelving | Install Closet Rod- Bedroom 1: closest to the front door : Light Fixture/Fan | Fan light does not work - replace fan- Bedroom 2: 2nd closest to the front door : Closet/Door/Track/Shelving | Replace closet rod- Bedroom 2: 2nd closest to the front door : Window Covering | Replace blinds- Bedroom 3: furthest from the front door : Switch/Outlet | Install smoke/CO detector- Bedroom 3: furthest from the front door : Window Covering | Replace blind- Dining Room 1 : Window Covering | Replace Blind- Hallway/Stairs 1 : Light Fixture | Replace bulb- Hallway/Stairs 1 : Other | Replace blind- Kitchen 1 : Window Covering | Replace other blind- Laundry Room 1 : Light Fixture/Fan | Replace bulb- Living Room 1 : Switch/Outlet | Replace Outlets- Living Room 1 : Window Covering | Replace Blinds- Basement 1 : Light Fixture/Fan | Replace bulb- Systems 1 : Thermostat | Reattach thermostatLine ItemsDescription AmountLabour hours, replace several blinds, screens, door stopper, replace toilet seat and toilet paper holder, reset showertiles, install closet rods, replace necessary bulbs, smoke detectors and outlets, touch up paint$2,096.38Shop Supplies $3.00Ace hardware invoice I51016 $44.64Ace Hardware I50619 $53.69Ace Hardware I50569 $43.57Total $2,552.16The gross rents on these units are great but so much of the profits get eaten away by the turnover costs it just makes less and less sense every year.
Dahrian Barrett
What to give to Appraiser?
26 December 2024 | 2 replies
That's it, but a) print out a page for each property you think is comparable, b) make the list of repairs long and inclusive of everything you've done. c) Put larger items first like kitchen remodel......and don't just say 'kitchen remodel', list things like 'custom backsplash tile/Bosch appliances/recessed can lighting/pot filler/etc. d) Cite the price/value of the work done, and don't be afraid to be generous.
Joseph Kirk
Advice on entering the fix & flip industry
5 January 2025 | 17 replies
Bathroom RemodelA modernized bathroom with new vanities, high-end fixtures, tile work, and updated plumbing features can greatly increase a home's value.
Thomas Malone
Anyone experienced with Lee Arnold's system
23 January 2025 | 56 replies
Also, he knew one of his guys had done a bad job on the kitchen tiling and was planning to redo it.
Corey Davis
Operationalizing & Scaling
31 December 2024 | 5 replies
., same tile, paint, flooring, etc.
Tove Fox
Nevada, Ohio, Michigan, Pennsylvania Out of State Investing
20 January 2025 | 22 replies
Positives are proximity, low property taxes, no income taxes, no weather events, very low maintenance stucco/tile structures, “young” properties (5-20 years old)