
24 April 2024 | 42 replies
I hate having paid for land that's doing nothing but I don't see any other option right now besides selling.You have to be careful with some of these Spec cabins as well.

20 April 2024 | 4 replies
The rates for our loans for investors including DSCR loans, Fix-n-Flip Loans, and Ground-Up Spec Construction (as well as the rates for consumer Conventional, FHA, VA, and USDA rates) are driven by Treasury Rates as opposed to the Fed Funds rate, but there is a loose connection.
19 April 2024 | 3 replies
I’ve heard about recent developments in the city, including Stelantes battery establishment, an Amazon warehouse, a new bridge, and the construction of a mega hospital.Considering the property’s condition, ongoing expenses, and potential development in the area, I’m contemplating whether to sell, especially since the property is not cash flowing and needs substantial renovations.

18 April 2024 | 4 replies
Really looking to upgrade to battery powered access control to be more efficient and cut costs during turnovers.

19 April 2024 | 4 replies
I have a HELOC in place on our personal residence and have used it exclusively for flips and spec builds.

21 April 2024 | 41 replies
I was also VERY concerned about the noise factor and your sound-proofing specs are like heaven-sent!!!

18 April 2024 | 8 replies
***this is very important…don’t skip getting good comps or, better yet, a good CMA***BUILDING PLANS, SPECS, AND QUOTES: For a construction project, they’ll need to understand the deal.

17 April 2024 | 5 replies
Electronics ones would be fine hard wired, but batteries don’t last very long in 60° with wind chill very long is what I meant

14 April 2024 | 25 replies
Just curious how many investors on here do new construction spec builds?

13 April 2024 | 2 replies
When i arrived she handed me a bill for $200 for batteries that had been replaced in the chair.