4 February 2019 | 5 replies
The cost to grade it will vary depending on a concrete demo then grade, meaning you will have some engineering cost to include soil testing, Surveying cost and a list of other test before the land is construction build ready. 4) What about the Architecture cost, Are you buying one of those already designed Duplex plan kits?

16 March 2021 | 8 replies
Since the I have had it cleared, soil work done, survey done, civil engineer is almost complete and I am looking for an architect.

8 February 2019 | 46 replies
But I don't think they were thinking clearly at the time...These were the same guys that complained about a roof leak & then put a cardboard Amazon box underneath it to collect the drips.I often wonder where they are now & do they vote???

22 April 2019 | 23 replies
The option with more units would include parking underneath the building) unit building.

6 February 2019 | 3 replies
What kind of soil is it?

10 February 2019 | 3 replies
Once that was done, there is a figure underneath monthly cash flow that no matter what numbers I put in would always say NO!
20 December 2019 | 28 replies
Then I had a water main break, under the house which is on a slab, likely washing away some soil underneath, resulting in one side of the furnace room sinking half an inch.I decided to sell when I priced the rehab costs.

19 January 2020 | 6 replies
A Phase 2 is more targeted and invasive, and includes actual collection and laboratory analysis of soil and/or other potentially contaminated media.

9 January 2020 | 4 replies
Building 1Section Condition# Comment"Grounds 1 The soil level was too high at the foundation.

5 January 2021 | 6 replies
- Resurfaced deck with synthetic boards, replaced old carpet with either laminate or sanded the hardwood underneath, painted rooms, replaced old light fixtures / ceiling fans with modern ones, updated interior door knobs, finished the basement because it is dry, installed recessed lighting in many rooms, upgraded electrical panel to 150A.